Mostrar el registro sencillo del ítem

dc.contributor.advisorRouco Rodríguez, Luis
dc.contributor.advisorArechederra Álvarez, José Ramón
dc.contributor.authorCorno Aparicio, Álvaro
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2017-03-14T16:03:46Z
dc.date.available2017-03-14T16:03:46Z
dc.date.issued2016
dc.identifier.urihttp://hdl.handle.net/11531/17566
dc.descriptionGrado en Ingeniería Electromecánicaes_ES
dc.description.abstractEste proyecto aborda el estudio de la gestión de potencia reactiva en un parque eólico con aerogeneradores basados en máquinas de inducción de jaula de ardilla El estudio nace de las penalizaciones mensuales en un parque eólico real por el incumplimiento de la consigna de factor de potencia establecida por el operador del sistema. Para comprender el funcionamiento del parque eólico se presentan los resultados de simulación del flujo de cargas del parque y se compara los citados resultados con los registros del parque. El interés de este proyecto es el cumplimiento de los requisitos de factor de potencia en el punto de conexión (220 kV). Por ello se presenta la potencia reactiva consumida en 220 kV frente a la potencia activa generada en 220 kV. Por supuesto, la simulación del flujo de cargas proporciona otros resultados (que no se muestran) como las tensiones en los diferentes nudos y los flujos por las líneas y transformadores. Para ajustar los resultados del modelo de simulación de flujo de cargas a las medidas registradas se muestran diferentes opciones de modelado y se compara el resultado del modelo de simulación con la realidad. En particular, se han considerado tres opciones de modelado con complejidad creciente y que se denominan opción 1, opción 2 y opción 3. Por último se investiga las necesidades de control de potencia reactiva y las posibles soluciones.es_ES
dc.description.abstractThis final degree project has studied the reactive power management in a wind farm with turbines based on induction machines squirrel cage. The study stems from the monthly penalties in a real wind farm of the set point power factor set by the system operator. To understand the wind farm operation, simulation results of flow of the park loads are presented and compared with the data recorded from the park. The interest of this project is the fulfillment of the requirements for power factor at the point of connection (220 kV). Thus the reactive power consumed in 220 kV versus active power generated at 220 kV is presented. Of course, the load flow simulation provides other results (not shown) as tensions in the different nodes and flows through the lines and transformers. To adjust the results of the simulation model of load flow measures recorded will leave modeling showing different options and comparing the result of the simulation model with reality. In particular, we have considered three options modeling with increasing complexity and designated as Option 1, Option 2 and Option 3. Finally the needs of reactive power control and possible solutions are investigated.es_ES
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoeses_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/*
dc.subject33 Ciencias tecnológicases_ES
dc.subject3322 Tecnología energéticaes_ES
dc.subject332203 Generadores de energíaes_ES
dc.titleGestión de potencia reactiva en un parque eólico con aerogeneradores basados en máquinas de inducción de jaula de ardillaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States