Mostrar el registro sencillo del ítem

dc.contributor.authorGorenstein Dedecca, Joaoes-ES
dc.contributor.authorHakvoort, Rudi A.es-ES
dc.contributor.authorHerder, Paulien M.es-ES
dc.date.accessioned2017-04-21T03:07:28Z
dc.date.available2017-04-21T03:07:28Z
dc.date.issued2017-04-15es_ES
dc.identifier.issn0360-5442es_ES
dc.identifier.urihttps:doi.org10.1016j.energy.2017.02.111es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractHVDC innovations and the integration of power markets and renewables drive the development of a European Northern Seas offshore grid. This power transmission system performs two functions: interconnecting Northern European onshore power systems, and connecting offshore wind farms. Despite its benefits, the development of an integrated offshore grid combining the two functions is slow. The main reasons are the lack of cooperation and governance frameworks to overcome regional differences and distribute costs and benefits. These barriers were studied so far only qualitatively or through perfect foresight optimization models. We complement this by studying transmission expansion pathways of the grid, which are non-optimal and path dependent, using a novel and open-source simulation model for offshore transmission investments. Different expansion typologies are considered, which we find perform the grid functions with different levels of integration and transmission capacities. Besides these typology factors, modelling and simulation factors also affect the expansion selection. Typology, modelling and simulation factors interact to result in radically different offshore grid pathways, which exhibit strong path dependence. Thus, to avoid locking-out beneficial expansions for the Northern Seas offshore grid, planning should be regional and consider HVDC innovations. Then individual projects can be implemented based on their own merits.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy, Periodo: 1, Volumen: online, Número: , Página inicial: 805, Página final: 824es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleTransmission expansion simulation for the European Northern Seas offshore grides_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordses-ES
dc.keywordsNorthern Seas; Offshore grid; Offshore wind; Path dependence; Simulation; Transmission expansion planningen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem