dc.contributor.authorMena Rossi, Humbertoes-ES
dc.contributor.otherUniversidad Pontificia Comillas,es_ES
dc.date.accessioned2017-11-15T08:18:29Z
dc.date.availablees_ES
dc.date.issued2018es_ES
dc.identifier.urihttp://hdl.handle.net/11531/23983
dc.descriptionEl objetivo principal es, basándome en los datos y parámetros de una finca ubicada en Jerez, el diseño de la instalación necesaria para abastecer de agua el área de cultivo, junto a sus respectivos costes y presupuestos.es_ES
dc.description.abstractEstamos ubicados en un terreno de ciento cuarenta y cuatro mil metros cuadrados, a diez kilómetros de Jerez de la Frontera, ubicado en Cádiz. En particular, esta finca estará dedicada específicamente a la agricultura orgánica de la granada. La finca actualmente tiene dos pozos y un depósito ubicado en el punto más alto. El objetivo principal es optimizar la instalación que suministrará el agua desde los pozos al depósito principal, buscando la mejor relación entre los componentes que se instalarán y los diferentes sistemas alternativos de alimentación que podemos usar. Se estimó que el flujo a la bomba para cada bomba es de tres metros cúbicos por hora. Hemos calculado que deberíamos instalar aproximadamente un total de mil treinta y cuatro metros de tubería. El material seleccionado es PVC, se ha seleccionado con un diámetro interno de ochenta milímetros. Entre cada uno de los tanques y el pozo, se instalarán válvulas de cierre y de seguridad. Además, será necesario usar adaptadores para posibles cambios de diámetro y juntas multidiámetro a lo largo de las tuberías. Uno de los pozos estará equipado con la bomba XJ25HD (se presupuestarán dos bombas de este modelo, para tener un repuesto en caso de falla o mantenimiento y su uso es esencial) y el pozo más cercano al tanque tendrá otra bomba: J12 D / DKS. Por lo tanto, la opción más viable económicamente asciende a cuarenta y dos mil ochocientos veintiséis euros (42.826 euros).es-ES
dc.description.abstractWe are located in a land of one hundred and forty-four thousand square meters, ten kilometers from Jerez de la Frontera, located in Cádiz. In particular, this farm will be dedicated specifically to the organic farming of the pomegranate. The land currently has two wells and a deposit located at the highest point. The main objective is to optimize the installation that will supply water from the wells to the main reservoir, looking for the best relationship between the components to be installed and the different alternative feeding systems that we can use. It was estimated that the flow to pump for each pump is three cubic meters per hour. We have calculated that we should install approximately a total of one thousand thirty-four meters of pipe. The selected material is PVC, it has been selected with an internal diameter of eighty millimeters. Between each of the tanks and the well, both shut-off and safety valves will be installed. In addition, it will be necessary to use adapters for possible diameter changes and multidiameter joints along the pipes. One of the wells will be equipped with the pump XJ25HD (two pumps of this model will be budgeted, to have a spare in case of failure or maintenance and its use is essential) and the well closest to the tank will have another pump: J12 D / DKS. Thus, the most economically viable option amounts to forty-two thousand eight hundred and twenty-six euros (42.826 euros).en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.subject.otherIEM-M (KL0-mecanica)es_ES
dc.titleDiseño estación de bombeo para riegoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsInstalación hidráulica, bombas hidráulicas, ahorro energético, dimensionamiento, bombeoes-ES
dc.keywordsHydraulic installation, hydraulic pumps, energy saving, sizing, pumpingen-GB