Mostrar el registro sencillo del ítem

dc.contributor.authorMuñoz Espinoza, Francisco Davides-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.contributor.authorOren, Shmuel S.es-ES
dc.contributor.authorHobbs, Benjamin F.es-ES
dc.date.accessioned2017-12-21T15:42:28Z
dc.date.available2017-12-21T15:42:28Z
dc.date.issued2018-05-01es_ES
dc.identifier.issn0195-6574es_ES
dc.identifier.urihttps:doi.org10.554701956574.39.3.fmunes_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractSome restructured power systems rely on audited cost information instead of competitive bids for the dispatch and pricing of electricity in real time, particularly in hydro systems in Latin America. Audited costs are also substituted for bids in U.S. markets when local market power is demonstrated to be present. Regulators that favor a cost-based design argue that this is more appropriate for systems with a small number of generation firms because it eliminates the possibilities for generators to behave strategically in the spot market, which is a main concern in bid-based markets. We discuss existing results on market power issues in cost- and bid-based designs and present a counterintuitive example, in which forcing spot prices to be equal to marginal costs in a concentrated market can actually yield lower social welfare than under a bid-based market design due to perverse investment incentives. Additionally, we discuss the difficulty of auditing the true opportunity costs of generators in cost-based markets and how this can lead to distorted dispatch schedules and prices, ultimately affecting the long-term economic efficiency of a system. An important example is opportunity costs that diverge from direct fuel costs due to energy or start limits, or other generator constraints. Most of these arise because of physical and financial inflexibilities that become more relevant with increasing shares of variable and unpredictable generation from renewables.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: The Energy Journal, Periodo: 1, Volumen: online, Número: 3, Página inicial: 51, Página final: 68es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleEconomic inefficiencies of cost-based electricity market designses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsElectricity market design, market power, equilibrium modeling, opportunity costsen-GB
dc.identifier.doi10.5547/01956574.39.3.fmunes_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem