Mostrar el registro sencillo del ítem

dc.contributor.authorVillar Collado, Josées-ES
dc.contributor.authorCampos Fernández, Francisco Albertoes-ES
dc.contributor.authorDoménech Martínez, Salvadores-ES
dc.contributor.authorDíaz Duran, Cristianes-ES
dc.date.accessioned2017-12-21T15:52:55Z
dc.date.available2017-12-21T15:52:55Z
dc.date.issued2017-06-06es_ES
dc.identifier.urihttp://hdl.handle.net/11531/24707
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractThe increasing penetration of Intermittent Generation (IG) is being accompanied by the revision of the needs of traditional regulation reserves, as well as the discussion of new flexibility products for system balancing. In the context of electricity generation models, it is of high relevance to adequately represent, not only the energy, but also the reserve dispatch constraints, by providing the models with the expected secondary reserve requirements (SRR), so as to output more realistic energy and reserve schedules and prices. This paper analyses the SRR published by the Spanish System Operator and uses several forecasting tools for determining its main explanatory variables. Results confirm that the SRR have remained almost constant during the years of significant IG growth (and even slightly decreasing in the most recent years), and that the best SRR estimation models found use the demand and its inter-hour variations as the main explanatory variables, but not wind productions as could be expected.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherTechnische Universität Dresden (Dresde, Alemania)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: 14th International Conference on the European Energy Market - EEM17, Página inicial: 1-5, Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleEstimation of the Spanish secondary reserves requirementses_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsTerms--ancillary services, econometrics, renewable generation, secondary reserve estimation, unit commitmenten-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem