• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 1.- Docencia
  • ICAI Escuela Técnica Superior de Ingeniería
  • Grado en Ingeniería Electromecánica
  • KL0-Trabajos Fin de Grado
  • View Item
  •   Home
  • 1.- Docencia
  • ICAI Escuela Técnica Superior de Ingeniería
  • Grado en Ingeniería Electromecánica
  • KL0-Trabajos Fin de Grado
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Análisis de costes de subestaciones eléctricas de alta tensión que implementen la tecnología IEC 61850 comparativo con las tecnologías cableadas convencionales

Thumbnail
View/Open
TFGM (1.202Mb)
ANXI (155.9Kb)
Date
2018
Author
Garcerán Sánchez, Andrés
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
El proyecto consiste en un análisis de la diferencia de costes que supondría la tecnología IEC 61850 en comparación con la tecnología de cableado de cobre convencional. Se empieza haciendo una introducción de la norma y después se explica la herramienta programada la cual es el objetivo principal del proyecto. Esta herramienta programada pide 3 entradas: el número de posiciones de líneas aéreas, transformadores y reactancias, la tensión del parque, a elegir entre 220kV o 400kV, y la configuración (interruptor y medio o doble barra). En base a estas entradas el programa halla el ahorro en las tres partes del estudio del trabajo de fin de grado: el cableado de control de la aparamenta, la electrónica de control y la obra civil. Además, permite desglosar el presupuesto para poder ver exactamente el ahorro en cada parte del estudio. Al final del proyecto hay unas conclusiones sacadas en base a las ejecuciones que se han hecho del programa para varias pruebas y ver como afecta la norma al tamaño de la subestación, a los dos tipos distintos de configuraciones y a las dos tensiones posibles. En los anexos del proyecto se incluyen el código del programa y un manual de usuario que explica detalladamente el funcionamiento del programa.
 
The project consists of a cost analysis difference between IEC 61850 technology and conventional copper cabling technology. The project starts start by introducing the standard and then it explains the programmed tool which is the main objective of the project. This programmed tool asks for 3 inputs: the number of positions of high tension aerial lines, transformers and reactance, the voltage of the substation, where it can be 220kV or 400kV, and the configuration (interrupter and half or double bus bar). Based on these inputs, the program calculates in the three parts of the end-of-degree work study: the control wiring of the electric equipment, control electronics and civil works. In addition, it allows to split the budget in order to be able to see exactly the savings are in each part of the study. At the end of the project there are some conclusions based on the executions that have been made of the program for several tests and see how the standard affects the size of the electrical substation, the two different types of configurations and the two possible voltages. In the annexes of the project, there is included the programmed code and a user manual where it is explained how the tool works.
 
URI
http://hdl.handle.net/11531/26190
Trabajo Fin de Grado
Análisis de costes de subestaciones eléctricas de alta tensión que implementen la tecnología IEC 61850 comparativo con las tecnologías cableadas convencionales
Titulación / Programa
Se trata de analizar el ahorro de costes de utilización de la tecnología IEC61850 en subestaciones eléctricas de alta tensión. Se deberán considerar todo tipo de costes para que el resultado sea lo más preciso posible, no sólo ahorro directo en los sistemas de protección y control. Se diferenciará entre subestaciones según su configuración, su nivel de tensión y su tecnología de aislamiento.
Materias/ categorías / ODS
IEM-E (KL0-elecrica)
Palabras Clave
Subestaciones eléctricas, IEC 61850, análisis, costes, herramienta programada.
Electrical substations, IEC 61850, analysis, costs, programmed tool
Collections
  • KL0-Trabajos Fin de Grado

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback