Mostrar el registro sencillo del ítem

dc.contributor.authorFioriti, Davidees-ES
dc.contributor.authorGiglioli, Romanoes-ES
dc.contributor.authorPoli, Davidees-ES
dc.contributor.authorLutzemberger, Giovannies-ES
dc.contributor.authorMicangeli, Andreaes-ES
dc.contributor.authorCitto, Riccardo Deles-ES
dc.contributor.authorPérez Arriaga, José Ignacioes-ES
dc.contributor.authorDueñas Martínez, Pabloes-ES
dc.date.accessioned2018-06-11T09:07:35Z
dc.date.available2018-06-11T09:07:35Z
dc.date.issued2018-07-01es_ES
dc.identifier.issn0378-7796es_ES
dc.identifier.uri10.1016j.epsr.2018.03.020es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe governments of developing countries struggle to guarantee the universal access to electricity on their territory and 1.2 billion people are still without any service, especially in remote areas. Hybrid mini-grids can be an effective solution since they exploit local renewable resources integrated with energy storage devices, reduce the use of fuel generators, and defer the construction of long and expensive grids until the growth of demand makes it profitable. Off-grid mini-grids are typically operated with simple load-following dispatching strategies, but predictive approaches can provide better performances, although at the expense of additional computational requirements. This paper investigates the benefits of using rolling-horizon dispatching strategies during the mini-grid design stage, also comparing how the optimal size of components is affected by several technical and economical parameters. Moreover, we propose the use of a stochastic sizing procedure that captures the uncertainties related to the load, to the renewable generation, and to the time required for the fuel procurement and delivery. A case study with real load data collected from an existing mini-grid placed in Habaswein, Kenya, is presented and discussed. The optimal sizing of some components turns out to be almost unaffected by the operational strategies, so their preliminary design can be simplified to avoid time-consuming simulations. Conversely, the optimal sizing of the diesel generator and of its fuel tank is strongly related to both the local economic parameters and the operational strategy of the mini-grid, which must be properly simulated.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Electric Power Systems Research, Periodo: 1, Volumen: online, Número: , Página inicial: 419, Página final: 428es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleStochastic sizing of isolated rural mini-grids, including effects of fuel procurement and operational strategieses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsMini-grid; Isolated system; Fuel management; Monte Carlo; Optimization; Rolling-horizon dispatchingen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem