Mostrar el registro sencillo del ítem

dc.contributor.authorUris Mas, Maríaes-ES
dc.contributor.authorLinares Hurtado, José Ignacioes-ES
dc.contributor.authorArenas Pinilla, Eva Maríaes-ES
dc.date.accessioned2019-03-19T04:11:41Z
dc.date.available2019-03-19T04:11:41Z
dc.date.issued15/08/2017es_ES
dc.identifier.issn0360-5442es_ES
dc.identifier.urihttp://hdl.handle.net/11531/35872
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractA previously developed procedure to evaluate a biomass plant feasibility has been improved, now considering availability and cost of the biomass resources around the plant's location. The plant is an organic Rankine cycle cogeneration facility located in mainland Spain. All the villages over 15.000 inhabitants have been considered as potential locations. Partial load operation is considered as well as cogeneration (CHP) and trigeneration (CCHP) schemes. Biomass calculations were performed using BIORAISE (a free GIS tool) showing that, in all the locations, the available biomass within a 30-km radius is larger than the demand, with an average cost of 10 /MWh. No subsidies have been considered. In CHP operation, all the locations lead to «high efficiency cogeneration» plants, with the best profitability in medium-severe to severe-winter climate zones. In CCHP mode, only locations in medium-to severe-winter climate zones reach «high efficiency». This mode is worthwhile in climate zones with mild winters and medium to hot summers. The optimum plant size is found to be smaller in CCHP compared to CHP in all the locations and the biggest plants are situated in climate zones with severe winters. Avoided CO2 emissions reach higher values in CHP mode compared to CCHP.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy, Periodo: 1, Volumen: 133, Número: , Página inicial: 969, Página final: 985es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleFeasibility assessment of an Organic Rankine Cycle (ORC) cogeneration plant (CHP/CCHP) fueled by biomass for a district network in mainland Spaines_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsCHP; CCHP; ORC; Biomass availability; Biomass costen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem