Mostrar el registro sencillo del ítem

dc.contributor.authorGerres, Timoes-ES
dc.contributor.authorChaves Ávila, José Pabloes-ES
dc.contributor.authorMartín Martínez, Franciscoes-ES
dc.contributor.authorRivier Abbad, Michel Luises-ES
dc.contributor.authorCossent Arín, Rafaeles-ES
dc.contributor.authorSánchez Miralles, Alvaroes-ES
dc.contributor.authorGómez San Román, Tomáses-ES
dc.date.accessioned2019-03-29T04:12:00Z
dc.date.available2019-03-29T04:12:00Z
dc.date.issued2019-06-01es_ES
dc.identifier.issn0301-4215es_ES
dc.identifier.urihttps:doi.org10.1016j.enpol.2019.03.034es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractElectricity systems experience a period of transition towards decarbonisation and face multiple uncertainties. Variable renewable energy resources undergo a rapid cost decline while policy makers push for stricter decarbonisation targets to limit global warming and to comply with international commitments such as the 2015 Paris Agreement. In this context, a better understanding on how today's electricity market design has to be modified to comply with high shares of variable RES generation is required. This work demonstrates the need to extend the current electricity market design by additional remuneration mechanisms to reach imposed quotas of renewable generation and provide investment incentives for new firm capacity. A Spanish case study presented in this paper explores the electricity system transition between 2025 and 2040. An electricity system resource expansion model (SPLODER) is used to study different policies and estimate the evolution of investments and costs over the transition period. Results indicate that the interactions between energy market prices, additional capacity and RES remuneration mechanisms are particularly sensible to policy decisions, demand growth and technological developments. Conclusions indicate that such remuneration mechanisms must account for the uncertainty of future electricity market developments and additional hedging alternatives are required to ensure the cost recovery of new generation technologies. Corrigendum to “Rethinking the electricity market design: Remuneration mechanisms to reach high RES shares. Results from a Spanish case study”  Energy Policy  Volume 131, August 2019, Page 434. https:doi.org10.1016j.enpol.2019.04.014 Energy Policy Volume 140, May 2020, 111436 https:doi.org10.1016j.enpol.2020.111436en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Energy Policy, Periodo: 1, Volumen: online, Número: , Página inicial: 1320, Página final: 1330es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleRethinking the electricity market design: remuneration mechanisms to reach high RES shares. Results from a Spanish case studyes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsDecarbonisation targets; Remuneration mechanisms; Variable renewables; Energy-only markets; Electricity system model; Electricity system transitionen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem