Mostrar el registro sencillo del ítem
Modeling the hidden flexibility of clustered unit commitment
dc.contributor.author | Morales España, German Andres | es-ES |
dc.contributor.author | Tejada Arango, Diego Alejandro | es-ES |
dc.date.accessioned | 2019-04-02T03:12:13Z | |
dc.date.available | 2019-04-02T03:12:13Z | |
dc.date.issued | 2019-07-01 | es_ES |
dc.identifier.issn | 0885-8950 | es_ES |
dc.identifier.uri | https:doi.org10.1109TPWRS.2019.2908051 | es_ES |
dc.description | Artículos en revistas | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | This letter proposes a clustered unit commitment (CUC) formulation to accurately model flexibility requirements such as ramping, reserves, and startupshutdown constraints. The classic CUC intrinsically and hiddenly overestimates the individual unit's flexibility, thus being unable to replicate the result of the individual UC. This letter presents a set of constraints to correctly represent the units’ hidden flexibility within the cluster. Different case studies show that the proposed CUC replicates the results of the individual UC while solving significantly faster. Therefore, the proposed CUC correctly represents the individual unit's flexibility within the cluster and could be used in large-scale planning models without significantly increasing their computational burden. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Revista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 4, Página inicial: 3294, Página final: 3296 | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Modeling the hidden flexibility of clustered unit commitment | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Unit commitment, clustered UC, ramping constraints, reserves, flexibility, renewable energy sources. | en-GB |
dc.identifier.doi | 10.1109/TPWRS.2019.2908051 | es_ES |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Artículos
Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.