Director
Mostrando ítems 1-3 de 3
-
Ramp‐based scheduling vs. energy‐block scheduling in day‐ahead market (DAM)
(2014)It has been recently reported that conventional unit commitment approach, which is based on energy-block, may not be capable of guaranteeing that the resulting energy schedule is feasible for dispatch [1, 2, 33, 41, ... -
Solar powered three-phase motor
(2017)En áreas geográficas aisladas y desfavorecidas donde el acceso a la red eléctrica es limitado, existe la necesidad de sistemas de generación de energía autónomos para desarrollar actividades que se consideran de primera ... -
Study of the wind energy development and the wind curtailment problem in China
(2017)The progressive trend in favor of renewable energy has been accelerating during the past few decades. This inclination for clean energy swept over the whole world and, China which is the biggest developing country and ...