Mostrar el registro sencillo del ítem

dc.contributor.authorTejada Arango, Diego Alejandroes-ES
dc.contributor.authorMorales España, German Andreses-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.contributor.authorCenteno Hernáez, Efraimes-ES
dc.date.accessioned2019-11-27T04:20:37Z
dc.date.available2019-11-27T04:20:37Z
dc.date.issued2020-05-01es_ES
dc.identifier.issn0885-8950es_ES
dc.identifier.urihttps:doi.org10.1109TPWRS.2019.2940286es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractFlexibility requirements are becoming more relevant in power system planning due to the integration of variable Renewable Energy Sources (vRES). In order to consider these requirements Generation Expansion Planning (GEP) models have recently incorporated Unit Commitment (UC) constraints, using traditional energy-based formulations. However, recent studies have shown that energy-based UC formulations overestimate the actual flexibility of the system. Instead, power-based UC models overcome these problems by correctly modeling ramping constraints and operating reserves. This paper proposes a power-based GEP-UC model that improves the existing models. The proposed model optimizes investment decisions on vRES, Energy Storage Systems (ESS), and thermal technologies. In addition, it includes real-time flexibility requirements, and the flexibility provided by ESS, as well as other UC constraints, e.g., minimum updown times, startup and shutdown power trajectories, network constraints. The results show that power-based model uses the installed investments more effectively than the energy-based models because it more accurately represents flexibility capabilities and system requirements. For instance, the power-based model obtains less investment (6-12) and yet it uses more efficiently this investment because operating cost is also lower (2-8) in a real-time validation. We also propose a semi-relaxed power-based GEP-UC model, which is at least 10 times faster than its full-integer version and without significantly losing accuracy in the results (less than 0.2 error).en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 3, Página inicial: 2012, Página final: 2023es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titlePower-based generation expansion planning for flexibility requirementses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordses-ES
dc.keywordsgeneration expansion planning, unit commitment, energy storage systems, capacity expansion planning, power system planning, power generation planning.en-GB
dc.identifier.doi10.1109/TPWRS.2019.2940286es_ES


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem