Show simple item record

dc.contributor.authorSigrist, Lukases-ES
dc.contributor.authorRouco Rodríguez, Luises-ES
dc.contributor.authorJiménez Serrano, Claraes-ES
dc.date.accessioned2019-12-04T03:33:36Z
dc.date.available2019-12-04T03:33:36Z
dc.date.issued03/06/2019es_ES
dc.identifier.urihttp://hdl.handle.net/11531/43723
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractThis paper presents a method to size battery energy storage systems (BESSs) to minimize underfrequency load shedding in island power systems. The proposed method depends on a simplified representation of the power system, where generating units are represented by firstorder systems. An analytical expression is derived to estimate the BESS size. The proposed method has been applied to two Spanish isolated power systems. Dynamic simulations with PSS/E software package confirm the proposed method to size BESS. BESS with a capacity around 6% to 9% of the installed generation capacity are needed to avoid load shedding.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherCongrès International des Réseaux Electriques de Distribution (Madrid, España)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: 25th International Conference and Exhibition on Electricity Distribution - CIRED 2019, Página inicial: 1-5, Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleSizing of a battery energy storage system to minimize underfrecuency load shedding in island power systemses_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsen-GB


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Show simple item record