Autor
Mostrando ítems 1-5 de 5
-
Feasibility assessment of an Organic Rankine Cycle (ORC) cogeneration plant (CHP/CCHP) fueled by biomass for a district network in mainland Spain
Uris Mas, María; Linares Hurtado, José Ignacio; Arenas Pinilla, Eva María (15/08/2017)A previously developed procedure to evaluate a biomass plant feasibility has been improved, now considering availability and cost of the biomass resources around the plant's location. The plant is an organic Rankine cycle ... -
Size optimization of a biomass-fired cogeneration plant CHP/CCHP (Combined heat and power/Combined heat, cooling and power) based on Organic Rankine Cycle for a district network in Spain
Uris Mas, María; Linares Hurtado, José Ignacio; Arenas Pinilla, Eva María (04/08/2015). -
Size optimization of a biomass-fired cogeneration plant CHP/CCHP (Combined heat and power/Combined heat, cooling and power) based on Organic Rankine Cycle for a district network in Spain
Uris Mas, María; Linares Hurtado, José Ignacio; Arenas Pinilla, Eva María (04/08/2015)This paper presents a methodology to optimize the size (electric power) of a cogeneration plant based on a biomass-fired Organic Rankine Cycle and connected to an existing district heating network, maximizing profitability. ... -
Techno-economic Feasibility Assessment of a Biomass Cogeneration Plan Based on an Organic Rankine Cycle
Uris Mas, María; Linares Hurtado, José Ignacio; Arenas Pinilla, Eva María (01/06/2014). -
Techno-economic feasibility assessment of a biomass cogeneration plant based on an Organic Rankine Cycle
Uris Mas, María; Linares Hurtado, José Ignacio; Arenas Pinilla, Eva María (01/06/2014)Biomass-fueled Organic Rankine Cycle power plants in a cogeneration topping layout have been operated in Central Europe since 2000. These plants are usually integrated into a district heating system and located near to the ...