Mostrar el registro sencillo del ítem

dc.contributor.advisorTellería, Mirenes-ES
dc.contributor.authorKeller Rodríguez, Lourdeses-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2020-01-27T17:38:27Z
dc.date.available2020-01-27T17:38:27Z
dc.date.issued2020es_ES
dc.identifier.urihttp://hdl.handle.net/11531/44494
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl proyecto consiste en adaptar la carretera que conecta un colegio de formación profesional con un poblado en Zimbabwe. Se trata de un proyecto que es parte de un programa de colaboración entre la organización Child Future Africa y la Fundación de Ingenieros de ICAI. El proyecto se centra en el diseño de la carretera adaptado al ámbito geográfico, social y económico de Zimbabwe considerando los siguientes aspectos técnicos: el sistema de drenaje y el estudio de los suelos. Tras el estudio de ambos puntos, se decide cómo diseño de la carretera un sistema de drenaje basado en el peralte de la carretera y la construcción de cunetas y una mejora de la calidad del suelo a través de la adición de grava en la subrasante y la estabilización con cal de la capa de afirmado. El objetivo del proyecto es, además de la mejora del camino, la formación de los habitantes del poblado de nuevas técnicas de construcción de carreteras y su mantenimiento. De esta manera, se ayuda al desarrollo de la comunidad de cara a un futuro mejor. Por último, se han evaluado los fondos necesarios para la construcción futura de la carretera a fin de poder financiarla y llevarla a cabo.es-ES
dc.description.abstractThe main objective of the project is the enhancement of an existing road that connects a village with a professional training center in Zimbabwe. The project will be carried out as part of joint collaboration program in this country between the Non-Profit Organizations “Child of Africa” and “ICAI Engineers Foundation”. The project is focused on the tailored design of the road to Zimbabwe geographical, social and economic situation considering as mayor technical challenges the drainage system and the ground study. As a result of the project camber system and ditches construction reveals as the most adequate solution for drainage and adding gravel to soil and stabilizing affirmation layer by aggregation of cal is the suggested procedure to improve soil quality. Local community training on updated road construction techniques and maintenance is a secondary outcome purpose of the project. Achieving this goal will contribute to local community development and consequently their future expectations. Required funds for the future construction of the road are also considered to ensure future funding and implementation of the project.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleAcondicionamiento de carretera de acceso para colegio formación profesionales_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsCarretera, Zimbabwe, Suelo, Arcilloso, Drenaje, Cuneta, Peralte, Estabilización, Cal.es-ES
dc.keywordsRoad, Zimbabwe, Soil, Clay, Drainage, Ditch, Camber, Stabilization, Cal.en-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States