Mostrar el registro sencillo del ítem
Generation expansion planning based on positive net present value
dc.contributor.author | Doménech Martínez, Salvador | es-ES |
dc.contributor.author | Campos Fernández, Francisco Alberto | es-ES |
dc.contributor.author | Villar Collado, José | es-ES |
dc.date.accessioned | 2020-05-01T03:15:58Z | |
dc.date.available | 2020-05-01T03:15:58Z | |
dc.date.issued | 2019-09-18 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/46050 | |
dc.description | Capítulos en libros | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | Many Generation Expansion Problems (GEP) models have been proposed in the literature based on agent-based equilibria or cost-minimization, integrated in bilevel or single-level models. In the simplest (and unrealistic)single-level cost minimization GEP with only the balance constraint, it can be proved that optimal generation investments are recovered through the system marginal cost, meaning that the Net Present Value (NPV) is 0. However, in more complex representations with additional constraints(such as technical or minimum capacity system constraints) non-profitable investments might occur, i.e., their NPV can go below 0.The aim of this work is to provide insights on how introducing complexity into GEP models affects the investments with and without imposing positive NPV as new constraints. The non-linearities in the NPV formulation are solved with a novel iterative algorithm. The main conclusion from the case studies is that the cost minimization GEP model forcing positive NPV can help to better represent the behavior of energy market players and simulate oligopolistic energy markets without explicitly representing profit maximization. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.publisher | Univerza v Ljubljani; Institute of Electrical and Electronics Engineers; Institute of Electrical and (Liubliana, Eslovenia) | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Libro: 16th International Conference on the European Energy Market - EEM19, Página inicial: 1-6, Página final: | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Generation expansion planning based on positive net present value | es_ES |
dc.type | info:eu-repo/semantics/bookPart | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Profitability, generation expansion planning, electricity market, optimization models, net present value | en-GB |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Artículos
Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.