• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Coordinated hydropower plant simulation for multireservoir systems

Thumbnail
Ver/
IIT-12-117A.pdf (3.943Mb)
Fecha
2014-02-01
Autor
Latorre Canteli, Jesús María
Cerisola Lopez De Haro, Santiago
Ramos Galán, Andrés
Perea Sánchez, Alejandro
Bellido Miranda, Rafael
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
Hydroreservoirs usually serve two main purposes: hydro-power production and water consumption. The great flexibility, low operation costs and low carbon impact of hydro turbines turns them into a desirable technology in the generator mix of power systems. In addition, sustainability and environmental concerns support their use in current power systems, along with other renewable energy sources like wind and solar energy. However, the stochastic nature of river inflows hinders their long term use and advises the use of planning tools. Hence, it also requires the use of planning tools in order to balance present and future requirements. This work presents a simulation tool that is employed at Iberdrola to help in the preparation of medium term hydroelectric production schedules. The main objective of the simulation is to follow the production guidelines given by a long term hydrothermal problem, while avoiding spillages and failures to fulfill water release agreements. In order to achieve this, the simulation algorithm is structured around several phases that aim at coordinating the operation of all the elements in the basin. This way the simulation tool provides the operator a way to evaluate the outcome from forecasts of either water inflows or future operation situations. Some of the potential applications of this simulation tool are shown in this work: general simulation in order to know in advance consequences of possible inflows forecasts, and how to assess several maintenance schedules and different upgrade plans.
 
URI
https:doi.org10.1061(ASCE)WR.1943-5452.0000306
Coordinated hydropower plant simulation for multireservoir systems
Tipo de Actividad
Artículos en revistas
ISSN
0733-9496
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Simulation, Hydropower production, Multireservoir system, Object-oriented programming
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias