Autor
Mostrando ítems 1-5 de 5
-
A capacity mechanism design for distribution network expansion planning
Álvarez Pérez, Manuel Alejandro; Rönnberg, Sarah K.; Bollen, Math H. J.; Frías Marín, Pablo; Cossent Arín, Rafael; Jabr, Rabih; Zhong, JinCapacity remuneration mechanisms have been originally oriented to ensure availability and continuity of supply on the power generation pool. Equivalent generation-based capacity mechanisms could be implemented to enhance ... -
A capacity mechanism design for distribution network expansion planning
Álvarez Pérez, Manuel Alejandro; Rönnberg, Sarah K.; Bollen, Math H. J.; Frías Marín, Pablo; Cossent Arín, Rafael; Jabr, Rabih; Zhong, Jin (Institute of Electrical and Electronics Engineers (Palermo, Italia), 2018-06-12)Capacity remuneration mechanisms have been originally oriented to ensure availability and continuity of supply on the power generation pool. Equivalent generation-based capacity mechanisms could be implemented to enhance ... -
Regulatory matters affecting distribution planning with distributed generation
Álvarez Pérez, Manuel Alejandro; Rönnberg, Sarah K.; Bollen, Math H. J.; Cossent Arín, Rafael; Zhong, JinUnder the present European directive concerning common rules for the internal market in electricity, distribution companies are not allowed to own Distributed Generation (DG) but encouraged to include it as a planning ... -
Remuneration assessment of a VPP providing distribution capacity services
Álvarez Pérez, Manuel Alejandro; Rönnberg, Sarah K.; Cossent Arín, Rafael; Zhong, Jin; Bollen, Math H. J.A Distribution System Operator (DSO) might consider a capacity contract as a planning alternative to defer grid investments. A Virtual Power Plant (VPP) might be able to provide such capacity and change its production as ... -
Remuneration assessment of a VPP providing distribution capacity services
Álvarez Pérez, Manuel Alejandro; Rönnberg, Sarah K.; Cossent Arín, Rafael; Zhong, Jin; Bollen, Math H. J. (Institute of Electrical and Electronics Engineers Power and Energy Society; University of Manchester (Mánchester, Reino Unido), 2017-06-18)A Distribution System Operator (DSO) might consider a capacity contract as a planning alternative to defer grid investments. A Virtual Power Plant (VPP) might be able to provide such capacity and change its production as ...