• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

A Model to long-term, multiarea, multistage, and integrated expansion planning of electricity and natural gas systems

Thumbnail
Ver/
IIT-10-064A.pdf (1.109Mb)
Fecha
2010-05-01
Autor
Unsihuay, Clodomiro
Marangon Lima, Jose Wanderley
Zambroni de Souza, A.C.
Pérez Arriaga, José Ignacio
Balestrassi, Pedro P.
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
A long-term, multiarea, and multistage model for the supplyinterconnections expansion planning of integrated electricity and natural gas (NG) is presented in this paper. The proposed Gas Electricity Planning (GEP) model considers the NG value chain, i.e., from the supply to end-consumers through NG pipelines and the electrical systems value chain, i.e., power generation and transmission, in an integrated way. The sources of NG can be represented by NG wells, liquefied natural gas (LNG) terminals and storages of NG and LNG. The electricity generation may be composed by hydro plants, wind farms, or thermal plants where the latter represent the link between the gas and the electricity chain. The proposed model is formulated as a mixed-integer linear optimization problem which minimizes the investment and operation costs to determine the optimal location, technologies, and installation times of any new facilities for power generation, power interconnections, and the complete natural gas chain value (supplytransmissionstorage) as well as the optimal dispatch of existing and new facilities over a long range planning horizon. A didactic case study as well as the Brazilian integrated gaselectricity system are presented to illustrate the proposed framework.
 
URI
https:doi.org10.1109TPWRS.2009.2036797
A Model to long-term, multiarea, multistage, and integrated expansion planning of electricity and natural gas systems
Tipo de Actividad
Artículos en revistas
ISSN
0885-8950
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Electricity systems, natural gas systems, operation and expansion planning of electricity systems, operation and expansion planning of natural gas systems.
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias