Mostrar el registro sencillo del ítem

dc.contributor.authorMéndez Quezada, Víctor Hugoes-ES
dc.contributor.authorRivier Abbad, Juan Martínes-ES
dc.contributor.authorFuente León, José Ignacio de laes-ES
dc.contributor.authorGómez San Román, Tomáses-ES
dc.contributor.authorArceluz Ogando, Josées-ES
dc.contributor.authorMarín, Javieres-ES
dc.contributor.authorMadurga, A.es-ES
dc.date.accessioned2016-01-15T11:19:30Z
dc.date.available2016-01-15T11:19:30Z
dc.date.issued2006-05-01es_ES
dc.identifier.issn0142-0615es_ES
dc.identifier.urihttps:doi.org10.1016j.ijepes.2005.11.016es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe amount of distributed generation (DG) is increasing worldwide, and it is foreseen that in the future it will play an important role in electrical energy systems. DG is located in distribution networks close to consumers or even in the consumers’ side of the meter. Therefore, the net demand to be supplied through transmission and distribution networks may decrease, allowing to postpone reinforcement of existing networks. This paper proposes a method to assess the impact of DG on distribution networks investment deferral in the long-term. Due to the randomness of the variables that have an impact on such matter (load demand patterns, DG hourly energy production, DG availability, etc.), a probabilistic approach using a Monte Carlo simulation is adopted. Several scenarios characterized by different DG penetration and concentration levels, and DG technology mixes, are analyzed. Results show that, once initial network reinforcements for DG connection have been accomplished, in the medium and long-term DG can defer feeder andor transformer reinforcements.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: International Journal of Electrical Power & Energy Systems, Periodo: 1, Volumen: online, Número: 4, Página inicial: 244, Página final: 252es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleImpact of distributed generation on distribution investment deferrales_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsElectricity distribution; Distribution planning; Electricity economics; Distributed generation; Monten-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem