Show simple item record

dc.contributor.authorEchavarren Cerezo, Franciscoes-ES
dc.contributor.authorLobato Miguélez, Enriquees-ES
dc.contributor.authorRouco Rodríguez, Luises-ES
dc.date.accessioned2016-01-15T11:19:41Z
dc.date.available2016-01-15T11:19:41Z
dc.date.issued05/09/2005es_ES
dc.identifier.issn1350-2360es_ES
dc.identifier.urihttp://hdl.handle.net/11531/5327
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThis paper presents a continuation and optimization based algorithm to detect power flow unfeasibility under the occurrence of contingency hypothesis. In addition, the algorithm obtains the power flow solution under contingency hypothesis, if it exists, no matter how ill–conditioned the power system is. The proposed algorithm is based on the parameterization of both branches outage and generation dispatch of the generators selected for contingency evaluation, defining a contingency convergence margin. The performance of the algorithm is illustrated considering an highly loaded scenario of the operation of the Spanish power system.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEE Proceedings-Generation Transmission and Distribution, Periodo: 1, Volumen: 152, Número: 5, Página inicial: 645, Página final: 652es_ES
dc.titleContingency Analysis: A Feasibility Identification and Calculation Algorithmes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsNo disponible/Not availableen-GB


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Show simple item record