dc.description.abstractEl proyecto es la climatización de un centro comercial en Málaga. El objetivo es realizar la instalación de climatización y para ello es necesario hacer los cálculos de cargas térmicas, calculo de la red de tuberías y calculo de la red de conductos. El edificio costa de 2 plantas sobre rasante que son las que se van a climatizar: una planta baja y una planta primera. La planta baja tiene 48268,86 m2 y 116 locales y la primera planta tiene 34169,63 m2 y 110 locales. La instalación se va a realizar para todos los locales y el mall de cada planta. Lo primero que hay que hacer calcular las cargas térmicas en verano e invierno para la situación mas desfavorable, que en este caso es enero a las 8:00 de la mañana y en verano depende de la localización. Una vez calculadas las perdidas de cargas de cada local y mall, se conoce el caudal de agua y aire caliente y frio necesario para contrarrestar dichas cargas. Los locales se van a climatizar a través de la red de tuberías. Y el mall se va a climatizar a través de conductos de aire y climatizadores. Una vez realizado el diseño de la red de tuberías y de la red de conductos se procede a la selección del equipo. En este caso se ha utilizado bombas de impulsión de agua fría y caliente, enfriadoras, calderas, climatizadores y difusores. Finalmente, el presupuesto de la instalación asciende a un total de 2.016.892,3 €. Además, cabe destacar que todo se ha realizado cumpliendo la normativa vigente y buscando la mayor eficiencia energética posible.es-ES
dc.description.abstractThe project is the air conditioning of a shopping centre in Malaga. The objective is to carry out the air conditioning installation and for this it is necessary to make the calculations of thermal loads, calculation of the pipe network and calculation of the duct network. The building has 2 floors above ground level which are the ones to be air-conditioned: a ground floor and a first floor. The ground floor has 48268,86 m2 and 116 premises and the first floor has 34169,63 m2 and 110 premises. The installation is to be carried out for all the premises and the mall on each floor. The first thing to do is to calculate the thermal loads in summer and winter for the most unfavourable situation, which in this case is January at 8:00 in the morning and in summer depends on the location. Once the load losses of each room and mall have been calculated, the flow of water and hot and cold air necessary to counteract these loads is known. The premises are to be air-conditioned through the pipe network. And the mall will be air-conditioned through air ducts and air conditioners. Once the design of the pipe network and the duct network has been carried out, the equipment is selected. In this case, hot and cold water supply pumps, chillers, boilers, air conditioners and diffusers have been used. Finally, the budget for the installation amounts to a total of 2,016,892.3 €. It should also be noted that everything has been carried out in compliance with current regulations and with the aim of achieving the highest possible energy efficiency.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3313 Tecnología e ingeniería mecánicaes_ES
dc.subject331326 Equipo de refrigeraciónes_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un centro Comercial en Málagaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsCargas termicas, Tuberias, Conductos, Caudal, Equiposes-ES
dc.keywordsThermal loads, Piping, Ductwork, Flow, Equipmenten-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States