• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
  •   DSpace Principal
  • 2.- Investigación
  • Artículos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

A plausible congestion management scheme for the internal electricity market of the European Union

Thumbnail
Ver/
IIT-03-037A.pdf (310.2Kb)
Fecha
2005-06-01
Autor
Pérez Arriaga, José Ignacio
Olmos Camacho, Luis
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
This paper proposes a scheme for the management of network congestion in the Internal Electricity Market (IEM) of the European Union. This scheme tries to combine the rigor in the treatment of the energy and transmission capacity transactions with the flexibility and pragmatism that are necessary to make the scheme compatible with the current diversity of regulatory approaches and market structures in the Member States participating in the IEM. First a reference scheme is presented with a complete formulation that jointly deals with the energy and capacity markets. Because of the implementation difficulties of this conceptually ideal approach a more pragmatic scheme is proposed instead. The core of this scheme is an explicit auction mechanism that must be run prior to any short-term (daily, typically) energy markets. In this auction, where only transmission capacity is traded, both bilateral contracts and energy bids to Power Exchanges can participate in order to acquire the capacity necessary to carry out their transactions. Some technical issues related to the practical implementation of the proposed approach are also examined; these include market liquidity, the financial or physical nature of the long-term contracts, the potential problems of \"slicing\" transmission capacity and the allocation of congestion rents. Market power issues are ignored.
 
URI
https:doi.org10.1016j.jup.2004.12.003
A plausible congestion management scheme for the internal electricity market of the European Union
Tipo de Actividad
Artículos en revistas
ISSN
0957-1787
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

congestion management, transmission network constraints, coordinated auction, network utilization, power transfer distribution factors.
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias