Mostrar el registro sencillo del ítem

dc.contributor.authorUgedo Álvarez-Ossorio, Alejandroes-ES
dc.contributor.authorLobato Miguélez, Enriquees-ES
dc.contributor.authorPeco González, Jesús Pascuales-ES
dc.contributor.authorRouco Rodríguez, Luises-ES
dc.date.accessioned2016-01-15T11:19:49Z
dc.date.available2016-01-15T11:19:49Z
dc.date.issued2005-05-01es_ES
dc.identifier.issn0885-8950es_ES
dc.identifier.uri10.1109TPWRS.2005.846085es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe security criteria of a power system require that branch power flows and bus voltages are within their limits, not only in normal operating conditions but also when any credible contingency occurs. In the Spanish electricity market, voltage constraints are solved by connecting a set of offline generators located in the areas where they occur. Thus, for a market participant it is necessary to predict approximately when its generating units are connected in order to prepare the annual budget andor decide the time and location of new plants. This paper proposes a methodology based on decision trees to estimate the daily load pattern of units that have not been cleared in the daily energy market and can be connected to alleviate the network constraints in the Spanish power system. The method explains the behavior of the daily load patterns of a nonconnected unit (obtained through clustering techniques) with a set of explanatory variables. The explanatory variables consist of the demand-generation imbalance in the electrical area of the generating unit and the maintenance scheduling of the transmission lines that feed the area. The method proposed is illustrated with a case study.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 2, Página inicial: 963, Página final: 972es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleDecision trees applied to the management of voltage constraints in the Spanish marketes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsClustering, competitive electricity market, congestion management, decision trees, power system dispatch, security assessmenten-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem