Mostrar el registro sencillo del ítem

dc.contributor.authorMuñoz Moro, Lucíaes-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2016-01-15T11:20:20Z
dc.date.available2016-01-15T11:20:20Z
dc.date.issued1999-08-01es_ES
dc.identifier.issn0885-8950es_ES
dc.identifier.urihttps:doi.org10.110959.780915es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThis paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodologyen-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: IEEE Transactions on Power Systems, Periodo: 1, Volumen: online, Número: 3, Página inicial: 1021, Página final: 1027es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleGoal programming approach to maintenance scheduling of generating units in large scale power systemses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsinteger programming maintenance engineering power generation planning scheduling thermal power stationsen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem