Mostrar el registro sencillo del ítem

dc.contributor.authorSánchez Martín, Pedroes-ES
dc.contributor.authorRamos Galán, Andréses-ES
dc.date.accessioned2016-01-15T11:27:42Z
dc.date.available2016-01-15T11:27:42Z
dc.date.issued2007-09-07es_ES
dc.identifier.urihttp://hdl.handle.net/11531/5642
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractThis paper shows the mathematical formulation of an inventory facility location decision problem. These facilities provide storage for agricultural biomass to be used as fuel at industrial plants. The decision problem bears in mind logistics cost (inventory and transportation), unsupplied penalties and delayed collection costs. Logical constraints, such as maximum storage capacity or maximum monthly available lorries, are taken into account. A real case study has been described in a high biomass collection and demand scenarios analyzing results for different number of inventory facilities.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherSin editorial (Madrid, España)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: XI Congreso de Ingeniería de Organización / International Conference on Industrial Engineering and Industrial Managment - CIO 2007, Página inicial: 843-852, Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleOptimal location and management of a biomass inventory facilityes_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsNetwork flow, Biomass, Logisticsen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem