Mostrar el registro sencillo del ítem

dc.contributor.authorCampos Fernández, Francisco Albertoes-ES
dc.contributor.authorVillar Collado, Josées-ES
dc.contributor.authorCenteno Hernáez, Efraimes-ES
dc.date.accessioned2021-06-21T03:02:35Z
dc.date.available2021-06-21T03:02:35Z
dc.date.issued2021-02-02es_ES
dc.identifier.issn2071-1050es_ES
dc.identifier.urihttps:doi.org10.3390su13041993es_ES
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractThe increasing penetration of renewable electricity generation is complicating the bidding and estimating processes of electricity prices, partly due to the shift of the overall cost sensitivity from operation (fuel) costs to investment costs. However, cost minimization models for capacity expansion are frequently based on the principle that, for a perfectly adapted system allowing non-served energy, marginal remuneration allows overall operation and investments costs recovery. In addition, these models are usually formulated as finite-horizon problems when they should be theoretically solved for infinite horizons under the assumption of companies’ infinite lifespan. But infinite horizon cannot be dealt with mathematical programming since it requires finite sets. Previous approaches have tried to overcome this drawback with finite horizon models that tend asymptotically to the original infinite ones and, in many cases, the investment costs are annualized based on the plants’ lifespan, sometimes including a cost residual value. This paper proposes a novel approach with a finite horizon that guarantees the investment costs recovery. It is also able to obtain the marginal electricity costs of the original infinite horizon model, without the need for residual values or non-served energy. This new approach is especially suited for long-term electricity pricing with investments in renewable assets when non-served demand is banned or when no explicit capacity remuneration mechanisms are considered.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.sourceRevista: Sustainability, Periodo: 1, Volumen: online, Número: 4, Página inicial: 1993-1, Página final: 1993-16es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleAnnualization of renewable investment costs for finite horizon electricity pricing and cost recoveryes_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.holderes_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordses-ES
dc.keywordsinfinite horizon models; investment theory; marginal pricing; renewable technologiesen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem