• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Under-relaxed Iterative Procedure for Feasible Short-Term Scheduling of a Hydro Chain.

Thumbnail
View/Open
IIT-03-017A.pdf (454.9Kb)
Date
2003-06-23
Author
García González, Javier
Parrilla Pozzy, Ernesto
Barquín Gil, Julián
Alonso Pérez, Javier
Sáiz Chicharro, Ángel
González Sanz, A.
Estado
info:eu-repo/semantics/publishedVersion
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
This paper presents a method for short-term hydro scheduling. The objective is to determine a feasible operation of a set of coupled hydro units, fulfilling the aggregate requirements obtained from a higher-level hydrothermal coordination tool. In order to take into account the nonlinear relationship among the electrical power, the net head and the turbine water discharge, an under-relaxed iterative procedure is proposed. The performance of this algorithm enhances previous research works as possible diverging oscillations are damped in order to reach the convergence. Therefore, the net heads used to build the powerdischarge curves of the head dependent units are determined using previous iterations results. This way, each stage can be solved by means of a MILP optimization problem where binary variables allow modeling the discrete hydro unitcommitment decisions. The process finishes when the maximum gap between the reservoir levels of two consecutive iterations satisfies the convergence tolerance. A case study is also presented to show its application to a real size hydro chain.
 
URI
http://hdl.handle.net/11531/5701
Under-relaxed Iterative Procedure for Feasible Short-Term Scheduling of a Hydro Chain.
Tipo de Actividad
Capítulos en libros
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

hydroelectric power generation, mixed integer linear programming, short-term hydro scheduling, water rights.
Collections
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback