Mostrar el registro sencillo del ítem

dc.contributor.advisorEhnberg, Jimmy
dc.contributor.authorMinayo Ferreruela, Pablo
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.contributor.otherChalmers University of Technologyen
dc.date.accessioned2016-01-29T12:34:20Z
dc.date.available2016-01-29T12:34:20Z
dc.date.issued2015
dc.identifier.urihttp://hdl.handle.net/11531/5962
dc.descriptionGrado en Ingeniería Electromecánicaes_ES
dc.description.abstractDesde hace ya mucho tiempo, la electricidad viene adquiriendo cada vez una importancia mayor en el día a día de los países desarrollados a través de las diversas aplicaciones para las que se usa; desde el simple alumbrado de casas hasta aparatos electrónicos, electrodomésticos, transporte, industria, etc. Por desgracia, esta realidad, como se ha mencionado, sólo se da en países desarrollados: el nivel de desarrollo de un país está directamente relacionado con el grado de uso de la electricidad, de modo que los países subdesarrollados se caracterizan por un uso mucho más precario de la electricidad. Por ello, la obligación de los países desarrollados debe ser luchar en contra de esa situación de desigualdad y subvertir esta situación. A través de diversos proyectos, algunos de estos países subdesarrollados pueden hacer uso de aparatos eléctricos gracias a pequeñas redes independientes instaladas en ciertas áreas. Este Proyecto se centra en el funcionamiento de una red eléctrica independiente, la cual funciona con un sistema de prepago de electricidad, en un área rural del sur de Tanzania, llamada Mawengi.es_ES
dc.description.abstractCurrently, the possibilities and characteristics about loads in new rural electrified areas are still to know. In this report it is analyzed a recent installed electric prepaid system in order to see if it is possible to extract the suitable conclusions with only the data of the purchases. Besides, it aims to size a system with these attributes, through the available data from this electric system facilitated by the central office of this area, in Mawengi, Tanzania. It is seen how the irregular profile of the purchases of energy of Mawengi through a year makes more difficult to set a power station and it is discussed if this system in particular is oversized. Also, it is analyzed how different customer groups, divided depending on their income, affect to this prepaid system, in terms of energy purchased and number of customers per group among others as well as the revenue that each of these groups is generating compared to the expected values. Finally it is advised some future steps in order to maximize the profit and think about new possibilities for this system or future systems in rural areas in developing countries.es_ES
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoenes_ES
dc.rightsAttribution-NonCommercial-ShareAlike 3.0 United States*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.subject33 Ciencias tecnológicases_ES
dc.subject3306 Ingeniería y tecnología eléctricaes_ES
dc.subject330609 Transmisión y distribuciónes_ES
dc.titleAnalysis of prepaid electricity systems in rural areas of developing countrieses_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsEnergy, Purchase, Consumption, Customeres_ES


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-ShareAlike 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-ShareAlike 3.0 United States