Mostrar el registro sencillo del ítem

dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorDíez Llovet, Teresaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2021-11-01T22:57:59Z
dc.date.available2021-11-01T22:57:59Z
dc.date.issued2022es_ES
dc.identifier.urihttp://hdl.handle.net/11531/63201
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl principal objetivo de este trabajo es el estudio y diseño de la climatización de un hospital en Burgos, garantizando el adecuado funcionamiento de este durante todos los días del año. Para ello, se debe ajustar al Reglamento de Instalaciones Térmicas de los Edificios (RITE) y a la normativa específica hospitalaria, en especial, la norma UNE 100713. El edificio está compuesto por 12 plantas. A su vez, está dividido en 8 bloques distintos. En este proyecto se han elegido 3 zonas para el estudio y diseño de la climatización. Estas 3 zonas suman un total de 844,1 m2 . Dos de estas tres zonas están en la planta 3 y corresponden a una zona de quirófanos y una zona de recuperación posanestésica. La tercera zona se corresponde con una zona de tipo UCI. Se deben garantizar las condiciones interiores requeridas para el mantenimiento de las instalaciones y medicamentos. Estas condiciones interiores son distintas según el tipo de sala que estemos y las requeridas en verano y en invierno son distintas. En los quirófanos se requiere en verano unas condiciones de 23ºC y 45% HR y en invierno 24ºC y 55% HR. En el resto de las salas a climatizar se exige en verano unas condiciones de 24ºC y 50% HR y en invierno: 22ºC y 45% HR. Se debe asegurar el confort de los pacientes y de los doctores, para esto se ha realizado el cálculo de cargas a vencer en las condiciones más desfavorables. En verano hay que tener en cuenta las cargas debidas a transmisión, radiación, y el calor producido por la ocupación de las personas, el alumbrado y los equipos. En invierno la única carga a tener en cuenta es la carga por transmisión y el caudal de aire exterior, el resto de los factores no se añaden ya que favorecen el calor necesario para cumplir las condiciones. Una vez se acaba el cálculo de cargas, se realiza el dimensionamiento las tuberías y se calcula la pérdida de carga en ellas. El caudal de agua necesario para alimentar a cada Fan-coil se calcula a partir de las pérdidas de invierno y verano y se divide entre un salto térmico. A partir de este cálculo de pérdidas se consigue obtener la altura efectiva de la bomba, necesaria para la selección de las bombas centrífugas. Tras el cálculo de la altura efectiva de la bomba se realiza el cálculo y dimensionamiento de la red de conductos. El caudal utilizado se obtiene de las cargas de verano. A continuación, se halla la pérdida de carga en la red. Tras estos cálculos, se procede a la selección de equipos. Los equipos que se han dimensionado son: climatizadores de aire primario, que alimentan a los fancoils, que a su vez alimentan a los difusores. Los fancoils seleccionados son de tubos, por lo que la red de tuberías constará de 4 tubos también. La producción de agua caliente y fría se hace mediante un equipo de refrigeración y una caldera, que forman el circuito de aire primario. En el anexo se encuentran todas las características de los equipos seleccionados, los cuales cumplen la normativa recogida en el Pliego de condiciones. El presupuesto total del proyecto es 474.855,4 €es-ES
dc.description.abstractThe main objective of this work is the study and design of the air conditioning of a hospital in Burgos, ensuring the proper functioning for all the year. For this purpose, it must be adjusted to the RITE (Regulation of Thermal Installations in Buildings) and to the specific hospital regulations, in particular, the UNE 100713. The building consists of 12 floors. In turn, it is divided into 8 different blocks. In this proyect 3 zones have been chosen for the study and design. These 3 zones occupy a total of 844,1 m2 . Two out of this three zones are on floor 3 and correspond to an operating room area and a post-anesthesia recovery area. The third zone correspond to an ICU-type area. The interior conditions requiered for the maintenance of the facilities must be guaranteed. These interior conditions are different depending on the type of room we are in, and those required in summer and winter are different. In the Ors, the conditions required are: 23ºC and 45%RH in summer and 24ºC and 55%RH in winter. In the other romos, the required conditions are: 24ºC and 50%RH in summer and 22ºC and 45%RH in winter. The comfort of the patients and doctors must be ensured, and for this purpose a calculation of the loads to be overcome has been made in the most unfavorable conditions. In summer, it is necessary to take into account the loads due to transmission, radiation, and the heat produced by the occupation of people, lighting and equipment. In winter, the only load to be taken into account is the load due to transmission and the flow of outside air, the rest of the factors are not added as they favor the heat necessary to meet the conditions. Once the load calculation is finished, the pipes are sized and the pressure drop in them is calculated. The water flow necessary to feed each fan-coil is calculated from the winter and summer losses and divided by a thermal jump. From this loss calculation, the effective head of the pump is obtained, which is necessary for the selection of the centrifugal pumps. After the calculation of the effective head of the pump, it is carried out the calculation and sizing of the duct network. The flow rate used is obtained from the summer loads. Then, the head loss in the network is found. After these calculations, the equipment is selected. The equipment that has been sized are: primary air conditioners, which feed the fan coils, which in turn feed the diffusers. The selected fan coils are of 4 tubes, so the piping network will also consist of 4 tubes. The production of hot and cold water is done by means of a cooling unit and a boiler, which form the primary air circuit. In the appendix you will find all the characteristics of the selected equipment, which comply with the regulations set out in the specifications. The total budget of the project is 474.855,4 €en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3305 Tecnología de la construcciónes_ES
dc.subject330526 Edificios públicoses_ES
dc.subject330590 Transmisión de calor en la edificaciónes_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un hospital en Burgoses_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsTuberias, conductos, cargas, planos, equipos de refrigeración, bombas, climatizadores, fancoil, calderas, caudales-ES
dc.keywordsPiping, ducts, loads, drawings, refrigeration equipment, pumps, air conditioners, fan coil units, boilers, flow ratesen-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States