Mostrar el registro sencillo del ítem

dc.contributor.advisorCepeda Fernández, Fernandoes-ES
dc.contributor.authorFerri Ferri, Antonioes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-01-20T16:00:58Z
dc.date.available2022-01-20T16:00:58Z
dc.date.issued2022es_ES
dc.identifier.urihttp://hdl.handle.net/11531/65060
dc.descriptionGrado en Administración y Dirección de Empresas y Máster Universitario en Ingeniería Industriales_ES
dc.description.abstractEl objeto de este trabajo de fin de máster es la elaboración del sistema de climatización y ventilación de un edificio de oficinas situado en Burgos. El edificio seleccionado tiene una forma sensiblemente rectangular y su superficie total de climatización es de 34690,2 m2. Con el objetivo de realizar un estudio optimizado del sistema de climatización se han seguido los siguientes pasos: Primero se han distribuido las zonas de cada planta a climatizar para calcular las cargas de verano e invierno de cada una de ellas. El cálculo de cargas tiene en cuenta los factores externos e internos que desfavorezcan la climatización. Las cargas en invierno, solo se tendrán en cuenta los factores externos. Por otra parte, las cargas de verano tendrán en cuenta los factores externos y los factores internos. El resultado de la carga de verano del edificio es de 3.111 Kw y en las cargas de invierno es de 2.797,8 Kw. Posteriormente, se calcula los caudales de aire de impulsión y retorno. Con las cargas térmicas y los caudales de aire se puede definir todos los equipos del el sistema de climatización. El siguiente paso es la red hidráulica. El edificio está separado en dos núcleos de producción y cada uno de estos tiene un circuito principal que alimenta el colector. De cada uno de estos núcleos se distribuye un circuito secundario para alimentar cada una de las plantas. La red de conductos encargada de la distribución de aire desde los equipos productores hasta los equipos terminales. La red de conductos cuenta con dos conductos, el primero de impulsión y el segundo de retorno. El circuito de retorno utilizará rejillas extractoras. Cada uno de los núcleos tendrá un climatizador primario que alimentará toda la red. El presupuesto del proyecto es de 6.000.865,59€es-ES
dc.description.abstractThe purpose of this master's thesis is to design the air conditioning and ventilation system of an office building located in Burgos. The selected building has a rectangular shape and its total air conditioning surface is 34690,2 m2. In order to carry out an optimized study of the air conditioning system, the following steps have been followed: First, the zones of each floor to be air-conditioned have been distributed to calculate the summer and winter loads of each of them. The calculation of loads takes into account the external and internal factors that are unfavorable for air conditioning. The winter loads will only take into account external factors. On the other hand, the summer loads will take into account external and internal factors. The result of the summer load of the building is 3,111 kW and winter loads is 2,797.8 kW. Subsequently, the supply and return air flow rates are calculated. With the thermal loads and air flow rates, all the equipment of the air conditioning system can be defined. The next step is the hydronic network. The building is separated into two production cores and each of these has a main circuit that feeds the manifold. From each of these cores a secondary circuit is distributed to feed each of the floors. The duct network is responsible for the distribution of air from the production equipment to the terminal equipment. The duct network has two ducts, the first for supply air and the second for return air. The return circuit will use exhaust grilles. Each of the cores will have a primary air conditioner that will feed the entire network. The project budget is €6,000,865.59.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject33 Ciencias tecnológicases_ES
dc.subject3313 Tecnología e ingeniería mecánicases_ES
dc.subject331315 Diseño de máquinases_ES
dc.subject331326 Equipo de refrigeraciónes_ES
dc.subject.otherH62-mecanica (MII-M)es_ES
dc.titleClimatización y ventilación de un edificio de oficinas en Burgoses_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsClimatización, Ventilación, Cargas térmicas, Cauldales de Aire, Red hidráulica y Conductoses-ES
dc.keywordsAir conditioning, Ventilation, Thermal loads, Air flow, Hydraulic network and ductsen-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States