Mostrar el registro sencillo del ítem
Diseño de una subestación transformadora 220/20 kV
dc.contributor.advisor | Fernández Magéster, Gerardo | |
dc.contributor.author | López Díaz, Manuel | |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2016-03-01T16:49:14Z | |
dc.date.available | 2016-03-01T16:49:14Z | |
dc.date.issued | 2015 | |
dc.identifier.uri | http://hdl.handle.net/11531/6616 | |
dc.description | Grado en Ingeniería Electromecánica | es_ES |
dc.description.abstract | La principal misión de la red de transporte es garantizar la seguridad de suministro y la calidad del servicio en todo el sistema eléctrico. La ciudad de Madrid cuenta con un sistema de 220 kV, que conforma prácticamente un anillo en torno a la capital. Sin embargo, existen ciertos puntos estratégicos que están aislados, siendo la principal razón la presencia de dos compañías distribuidoras distintas en estas zonas. El proyecto Residencial Metropolitan es un ambicioso proyecto urbanístico que se encuentra en las cercanías de las subestaciones de Azca y El Pilar, pertenecientes a Gas Natural Fenosa y a Iberdrola, respectivamente. El presente proyecto pretende conectar estas subestaciones para mejorar el servicio, y al mismo tiempo, ampliar la capacidad red de distribución en la zona de Cuatro Caminos. La subestación empleará la tecnología GIS, de uso generalizado en subestaciones urbanas, donde la reducción de espacio y la fiabilidad de la instalación son objetivos prioritarios. | es_ES |
dc.description.abstract | The main objective of the transmission network is to guarantee the security of supply and the quality of service in the whole electric system. While the city of Madrid is almost completely surrounded by a ring-like 220 kV system, there are still some isolated nodes that belong to different distribution system operators. Residencial Metropolitan is an ambitious urban project, located near Azca and El Pilar substations, which belong to Gas Natural Fenosa and Iberdrola, respectively. This project aims at providing a solution to connect these substations so as to improve the service, while upgrading the transmission capacity of the distribution network in Cuatro Caminos. The substation will make use of the GIS (Gas-Insulated Switchgear) technology, which is especially suitable for urban substations, where space reduction and reliability are the main goals. | es_ES |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.subject | 33 Ciencias tecnológicas | es_ES |
dc.subject | 3306 Ingeniería y tecnología eléctrica | es_ES |
dc.title | Diseño de una subestación transformadora 220/20 kV | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |