dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractEn este proyecto se realiza el diseño completo de la planta solar fotovoltaica La Higuerilla, de 5,48 MWp de potencia pico y 4,48 MWn de potencia nominal, con la que se generarán 8.114 MWh/año (equivalente al consumo anual de 2.029 hogares), reduciendo así las emisiones de CO2 emitidas a la atmósfera en 25.194 tCO2 a lo largo de la vida útil del proyecto. Como parte del diseño, se incluye la evaluación del terreno, diseño de la planta y la elaboración de planos y cálculos necesarios para su implantación. Se realizan también un estudio de producción y un estudio económico para determinar la viabilidad económica de la planta y se evalúa su impacto medioambiental. A lo largo de la vida útil de la planta, se inyectará a la red 189,4 GWh de energía y se evitará la emisión de 25.194 tCO2 a la atmósfera. En el aspecto económico, se ha determinado un presupuesto total para la construcción y puesta en marcha de la planta de 3.457.924 €, incluida la infraestructura de evacuación, y se estiman los retornos de la inversión en un VAN de 20.169 € y un TIR del 8,2%.es-ES
dc.description.abstractThis project consists of the complete design of the solar photovoltaic plant La Higuerilla, with 5.48 MWp of peak power and 4.48 MWn of nominal power, with which 8,114 MWh/year will be generated (equivalent to the annual consumption of 2,029 homes), thus reducing CO2 emissions emitted into the atmosphere by 25,194 tCO2 throughout the useful life of the project. As part of the design, it includes the evaluation of the available land, design of the plant and the preparation of plans and calculations necessary for its implementation. A production study and an economic study are also carried out to determine the economic feasibility of the plant and its environmental impact is evaluated. Throughout the life of the plant, 189.4 GWh of energy will be injected into the grid and the emission into the atmosphere of 25,194 tCO2 will be avoided. Regarding the economic aspect, the total budget for the construction and commissioning of the plant has been estimated at € 3,457,924, including the evacuation infrastructure, and the returns on investment are estimated at a NPV of € 20,169 and an IRR of 8.2%.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherH62-electrotecnica (MII-E)es_ES
dc.titleDiseño de una planta solar fotovoltaica reales_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsPlanta, generación, solar, fotovoltaica, energía renovable, generación verde.es-ES
dc.keywordsPV, generation, solar, photovoltaic, renewable energy, green generation.en-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States