Mostrar el registro sencillo del ítem

dc.contributor.advisorHernández Bote, Juan Antonioes-ES
dc.contributor.authorSantos Calvo, María del Mares-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2022-10-06T10:21:18Z
dc.date.available2022-10-06T10:21:18Z
dc.date.issued2023es_ES
dc.identifier.urihttp://hdl.handle.net/11531/74443
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl presente proyecto tiene como objeto el diseño y dimensionado del sistema de climatización de un hospital en Ciudad Real para atender la demanda de bienestar e higiene de sus usuarios. Dentro del sistema de climatización mencionado se han considerado tanto las instalaciones térmicas fijas (calefacción, refrigeración y ventilación) como las de producción de agua fría y caliente. En este caso, el edificio a acondicionar es un hospital constituido por una planta baja, desde donde se brinda en acceso al edificio, tres plantas troncales y la cubierta o azotea, lugar donde se instalarán los equipos de climatización. El diseño de estos equipos pretende cubrir las necesidades térmicas del edificio durante todo el año. Es por ello que se han considerado las condiciones climatológicas de Ciudad Real, además de las posibles demandas de uso del público destinado a ocupar el edificio. Las condiciones climáticas de Ciudad real se definen en la Guía Técnica de Condiciones Climáticas Exteriores de Proyecto (IDAE). Las condiciones interiores del edificio seguirán las exigencias impuestas por el RITE. Asimismo, se hace relevante definir también las cargas internas de los locales (alumbrado, sonido, equipos, ocupación, etc), las cuales vienen determinadas por la clase de edificio a aclimatar. Con el objeto de diseñar las instalaciones térmicas del hospital, se ha comenzado por calcular las cargas térmicas que va a soportar tanto en verano como en invierno. Se ha escogido la situación diurna más restrictiva, pues de este modo quedan cubiertas todas las casuísticas. Por otro lado, debido a que el edificio objeto de este proyecto es un Hospital, con unas necesidades más restrictivas, existirán niveles de ventilación superiores a los indicados. Además, en algunas zonas se evitará la recirculación de aire, teniendo así en cuenta las sobrepresiones a alcanzar en cada local. Una vez finalizado el cálculo de las cargas térmicas, se procede a la selección de los equipos destinados a cubrir esas demandas. En este caso, el hospital contará con dos instalaciones térmicas diferentes, pues habrá zonas cuyas necesidades harán prescindible el uso de fancoils, por lo que se instalarán climatizadores independientes en cada una de sus cubiertas. Dichas zonas son la sala de cultos y las cafeterías personal y pública. Sin embargo, la mayoría de localidades del edificio requieren un control de temperatura individual, por lo que se ha diseñado un sistema de acondicionamiento de 294 unidades de fancoils de 4 vías alimentadas a través de aire primario por 4 climatizadores situados en la cubierta del edificio. Por otro lado, el sistema de distribución de agua a de ser capaz de vencer las pérdidas de carga que se presentan. Motivo por el cual se ha decidido instalar un sistema centralizado de 20 bombas en serie capaz de impulsar el agua sanitaria por la red de tuberías. El aire primario destinado a realizar la ventilación del edificio se distribuirá a través de una red de conductos debidamente dimensionada según las exigencias de espacio y confort de las personas. Finalmente, se ha llevado a cabo el diseño del sistema de tuberías a 4 tubos, ya que este se divide en función de la temperatura del agua y de si se trata de la impulsión o del retorno de agua. El cálculo mencionado parte de los puntos más alejado de los equipos de climatización pues estos presentan nuevamente las condiciones más restictivas. El diseño y distribución de las redes de agua y aire se encuentran en el documento IV: Planos de la memoria. Asimismo, en la memoria del proyecto también se han adjuntado las hojas más representativas del cálculo de cargas de verano e invierno y de las tuberías y conductos a incluir en el sistema de climatización. Dichos ficheros se encuentran en el apartado III: Anexos. Dicho documento incluye los catálogos de los proveedores de cada uno de los equipos a instalar en el edificio. El precio total de la instalación completa del sistema de climatización para este edificio alcanza los 451.741,52€ brutos.es-ES
dc.description.abstractThe purpose of this project is the design and dimensioning of the air conditioning system of a hospital in Ciudad Real to meet the demand for well-being and hygiene of its users. Within the previously mentioned air conditioning system, both fixed thermal installations (heating, cooling and ventilation) and those for the production of cold and hot water have been considered. In this case, the building to be conditioned is a hospital consisting of a ground floor, from where access to the building is provided, three trunk floors and the roof or roof, where the air conditioning equipment will be installed. The design of this equipment aims to cover the thermal needs of the building throughout the year. That is why the weather conditions of Ciudad Real have been considered, in addition to the possible demands of use of the public destined to occupy the building. The climatic conditions of Ciudad real are defined in the Technical Guide of External Climatic Conditions of Project (IDAE). The interior conditions of the building will follow the requirements imposed by the RITE. Likewise, it is also relevant to define the internal loads of the premises (lighting, sound, equipment, occupation, etc.), which are determined by the type of building to be acclimatized. In order to design the thermal installations of the hospital, it has begun by calculating the thermal loads that it will withstand both in summer and winter. The most restrictive daytime situation has been chosen, since in this way all the casuistry are covered. On the other hand, due to the fact that the building object of this project is a Hospital, with more restrictive needs, there will be ventilation levels higher than those indicated. In addition, in some areas air recirculation will be avoided, thus taking into account the overpressures to be reached in each location. Once the calculation of the thermal loads is completed, the equipment destined to cover these demands is selected. In this case, the hospital will have two different thermal installations, as there will be areas whose needs will make the use of fancoils dispensable, so independent air conditioners will be installed on each of its roofs. These areas are the worship hall and the personal and public cafeterias. However, most locations in the building require individual temperature control, so a conditioning system has been designed for 294 units of 4-way fancoils fed through primary air by 4 air conditioners located on the roof of the building. On the other hand, the water distribution system must be able to overcome the pressure losses that occur. Reason why it has been decided to install a centralized system of 20 pumps in series capable of driving sanitary water through the network of pipes. The primary air intended to ventilate the building will be distributed through a network of ducts properly sized according to the space and comfort requirements of people. Finally, the design of the pipe system to 4 tubes has been carried out, since this is divided according to the temperature of the water and whether it is the impulsion or the return of water. The calculation previously mentioned starts from the furthest points of the air conditioning equipment because these present again the most restrictive conditions. The design and distribution of the water and air networks are found in document IV: Plans of the memory. Likewise, the most representative sheets of the calculation of summer and winter loads and the pipes and ducts to be included in the air conditioning system have also been attached to the project report. These files can be found in section III: Annexes. This document includes the catalogs of the suppliers of each of the equipment to be installed in the building. The total price of the complete installation of the air conditioning system for this building reaches € 451,741.52 gross.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un Hospital en Ciudad Reales_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsPalabras clave: climatización, equipos, tubería, conducto, aire, aguaes-ES
dc.keywordsKeywords: air conditioning, equipment, pipe, duct, air, wateren-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States