Transmission network expansion planning for the Colombian electrical system: connecting the Ituango hydroelectric power plant

Thumbnail
Ver/
IIT-14-164A.pdf (1.582Mb)
Fecha
01/05/2014
Autor
Vinasco, Guillermo Enrique
Tejada Arango, Diego Alejandro
Da Silva, Emivan F.
Rider, Marcos J.
Estado
info:eu-repo/semantics/publishedVersion
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
 
 
The hydroelectric power plant HidroItuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in connecting HidroItuango, in order to strengthen the Colombian national transmission system. A Mixed Binary Linear Programming (MBLP) model was used to solve the Multistage Transmission Network Expansion Planning (MTEP) problem of the Colombian electrical system, taking the N-1 safety criterion into account. The N-1 safety criterion indicates that the transmission system must be expanded so that the system will continue to operate properly if an outage in a system element (within a pre-defined set of contingencies) occurs. The use of a MBLP model guaranteed the convergence with existing classical optimization methods and the optimal solution for the MTEP using commercial solvers. Multiple scenarios for generation and demand were used to consider uncertainties within these parameters. The model was implemented using the algebraic modeling language AMPL and solved using the commercial solver CPLEX. The proposed model was then applied to the Colombian electrical system using the planning horizon of 2018-2025.
 
URI
http://hdl.handle.net/11531/7690
Transmission network expansion planning for the Colombian electrical system: connecting the Ituango hydroelectric power plant
Tipo de Actividad
Artículos en revistas
ISSN
0378-7796
Palabras Clave

Multistage Transmission Network Expansion Planning; N-1 safety criterion; Scenarios for generation and demand; Mixed Binary Linear Programming
Colecciones
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias