Mostrar el registro sencillo del ítem

dc.contributor.advisorMartín Serrano, Javieres-ES
dc.contributor.authorGonzález Calvo, Jorgees-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2023-09-29T10:31:09Z
dc.date.available2023-09-29T10:31:09Z
dc.date.issued2024es_ES
dc.identifier.urihttp://hdl.handle.net/11531/83530es_ES
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractSe llevará a cabo la climatización de un centro cultural en la provincia de Soria. En él se cumplirán en todo momento las normativas vigentes como el Código Técnico de la Edificación (CTE) y el Reglamento de instalaciones Térmicas en Edificios (RITE). El edificio a estudiar consta de 5 plantas, sin embargo, debido a sus 5765m2 de superficie, se ha decidido estudiar únicamente la planta baja del edificio en la que se pueden encontrar diferentes estancias como el vestíbulo principal, cafetería/restaurante, cocina, salas de exposiciones permanentes y temporales, oficinas, etc. El área total a climatizar es de 1019,05 m2. Cada localidad tendrá sus requerimientos con sus correspondientes equipos de climatización los cuales serán estudiados a lo largo de este proyecto y estarán situados en la cubierta del edificio. En primer lugar, se realizará el cálculo de cargas de invierno y verano con el fin de saber qué aparamenta es la necesaria para climatización. Para llevar a cabo estos cálculos se tomarán las temperaturas límite tanto de invierno como de verano en la provincia de Soria. Éstas son 28,4ºC en verano y -7ºC en invierno. Posteriormente se seleccionarán los equipos necesarios para contrarrestar estas cargas y se procederá al diseño de las tuberías teniendo en cuenta el caudal de agua que tendrá que soportar cada una de ellas. En último lugar, se realizará el diseño de la red de conductos que permitirá la correcta climatización de las estancias. Las tuberías se encargan de transportar el agua (fría o caliente en función de la época del año o las necesidades específicas de cada estancia) desde la caldera o enfriadora situados en la cubierta del edificio hacia los fancoils u otros dispositivos de climatización dentro de las diferentes estancias. La propulsión del agua es posible gracias a las bombas, diseñadas también en este proyecto. Además de transportar agua para la climatización de las diferentes estancias también serán las encargadas de distribuir agua a las unidades autónomas de climatización propias de la sala de seguridad y comunicaciones. Por otro lado, los conductos serán los encargados de distribuir el aire proveniente del climatizador de aire primario hacia las salas de exposiciones y restaurante de manera uniforme y controlada, manteniendo las condiciones ambientales dentro de los límites marcados. Finalmente, con los equipos cuidadosamente seleccionados, el presupuesto final del proyecto asciende a la cantidad de 404.742,15€ (cuatrocientos cuatro mil setecientos cuarenta y dos euros con quince céntimos). (I.V.A. no incluido). Además, teniendo en cuenta que la superficie climatizada es de 1.019,05 m2, el coste total por metro cuadrado asciende a la cantidad de 397,18€ (trescientos noventa y siete euros y dieciocho céntimos).es-ES
dc.description.abstractAir conditioning will be carried out in a cultural center in the province of Soria, adhering at all times to current regulations such as the Technical Building Code (CTE) and the Regulations for Thermal Installations in Buildings (RITE). The building to be studied consists of 5 floors, however, due to its 5765m2 of surface area, it has been decided to study only the ground floor of the building where different rooms such as the main foyer, café/restaurant, kitchen, permanent and temporary exhibition halls, offices, etc. can be found. The total area to be climate controlled is XXX m2. Each area will have specific requirements with corresponding climate control equipment to be studied throughout this project, situated on the building's roof. Initially, winter and summer load calculations will determine the necessary equipment for climate control. Temperature limits of 28.4°C in summer and -7°C in winter in Soria will be considered. Subsequently, necessary equipment will be selected to counteract these loads, followed by the design of piping considering the water flow each will need to support. Finally, a duct network design will ensure proper climate control in the rooms. Piping will transport water (hot or cold depending on the season or specific room requirements) from the boiler or chiller located on the building's roof to fan coils or other air conditioning devices within different rooms. Water propulsion is facilitated by pumps designed in this project. In addition to transporting water for room air conditioning, pipes will also distribute water to autonomous air conditioning units for the security and communications room. Conducts, on the other hand, will distribute air from the primary air conditioner to exhibition halls and the restaurant in a uniform and controlled manner, maintaining ambient conditions within defined limits. Finally, with the carefully selected equipment, the final project budget amounts to €404,742.15 (four hundred four thousand seven hundred forty-two euros and fifteen cents). (VAT not included). Additionally, considering the climatized area is 1,019.05 m², the total cost per square meter amounts to 397.18€ (three hundred ninety-seven euros and eighteen cents).en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un Centro Cultural localizado en Soriaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsClimatización, cargas, estancias.es-ES
dc.keywordsAir conditioning, loads, rooms.en-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States