Mostrar el registro sencillo del ítem

dc.contributor.advisorHernández Bote, Juan Antonioes-ES
dc.contributor.authorContreras Martín, Aldara Maríaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2024-01-15T11:24:02Z
dc.date.available2024-01-15T11:24:02Z
dc.date.issued2024es_ES
dc.identifier.urihttp://hdl.handle.net/11531/86212es_ES
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl objeto del proyecto es la climatización de un edificio de oficinas localizado en Cuenca. Este estudio se realizará cuidadosamente, vigilando que las instalaciones finales cumplan la normativa establecida para el correcto funcionamiento de la climatización del edificio. El edificio está formado por un total de 8 plantas más la cubierta. De estas 8 plantas la primera es la denominada planta baja y las demás van de la planta 1 a la planta 7. Hasta la planta 4 incluida tenemos dos módulos claramente separados ofreciendo así dos zonas de oficinas independientes cuya única zona en común es la de los ascensores teniendo así baños también independientes para ambos módulos. Estos dos módulos serán distinguidos en todo el proyecto como módulo A y módulo B. A partir de la planta 5 solo existe el módulo A de oficinas. Está disposición ofrece una gran versatilidad y capacidad de adaptación según las necesidades de las empresas. Además, cuenta con grandes ventanales que aseguran la luz natural del edificio para una óptima calidad de ambiente de trabajo. En primer lugar, se procederá a realizar los cálculos de verano tanto de verano como de invierno basándonos en las condiciones más desfavorables, es decir, para el día más caluroso de verano y más frío de invierno. Para ello, se realizará un estudio del clima de Cuenca para proceder a realizar los cálculos de cargas. A continuación, se hará el cálculo de redes hidráulicas que abarca el dimensionamiento de conductos de agua o tuberías tanto fría como caliente, y de los conductos de aire tanto de impulsión como de retorno. Tras ello, se seleccionarán los equipos a utilizar en la instalación: fan-coils, calderas, grupos frigoríficos, bombas, vasos de expansión…y los demás equipos necesarios para la correcta climatización del edificio. El trabajo contará con un estudio completo, conteniendo los cálculos explicados anteriormente además de los planos, pliegos de condiciones y el presupuesto final.es-ES
dc.description.abstractThe purpose of the project is the air conditioning of an office building located in Cuenca. This study will be carried out carefully, ensuring that the final installations comply with the regulations established for the correct operation of the air conditioning of the building. The building consists of a total of 8 floors plus the roof. Among these 8 floors, the first one is called the ground floor and the others go from floor 1 to floor 7. Up to and including floor 4, we have two clearly separated modules, thus offering two independent office areas whose only common area is the elevators, with independent bathrooms for both modules. These two modules will be distinguished throughout the project as module A and module B. From floor 5 onwards, there is only module A for offices. This layout offers great versatility and adaptability according to the needs of the companies. In addition, it has large windows that ensure the building's natural light for an optimal quality of work environment. First of all, summer and winter calculations will be made based on the most unfavorable conditions, i.e., for the hottest day in summer and the coldest in winter. For this purpose, a study of the climate of Cuenca will be carried out in order to proceed with the load calculations. . Then, the calculation of hydraulic networks will be made, which includes the sizing of water ducts or pipes both hot and cold, and air ducts both supply and return. After that, the equipment to be used in the installation will be selected: fan-coils, boilers, cooling units, pumps, expansion vessels... and other equipment necessary for the correct air conditioning of the building. The work will include a complete study, containing the calculations explained above in addition to the plans, specifications and final budget.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un Edificio de Oficinas en Cuencaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsCLIMATIZACIÓN DE UN EDIFICIO DE OFICINAS EN CUENCAes-ES
dc.keywordsAIR-CONDITIONING OF AN OFFICE BUILDING IN CUENCAen-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States