Mostrar el registro sencillo del ítem
Multistage distribution expansion planning leveraging load flexibility
dc.contributor.author | Ulrich Ziegler, David | es-ES |
dc.contributor.author | Mateo Domingo, Carlos | es-ES |
dc.contributor.author | Gómez San Román, Tomás | es-ES |
dc.contributor.author | Prettico, Giuseppe | es-ES |
dc.date.accessioned | 2024-02-21T10:09:48Z | |
dc.date.available | 2024-02-21T10:09:48Z | |
dc.date.issued | 2024-03-01 | es_ES |
dc.identifier.issn | 0378-7796 | es_ES |
dc.identifier.uri | https:doi.org10.1016j.epsr.2023.110094 | es_ES |
dc.description | Artículos en revistas | es_ES |
dc.description.abstract | es-ES | |
dc.description.abstract | This paper presents the multistage distribution network planning problem, utilizing conventional and non-conventional expansion measures. Here, conventional network expansions, i.e. transformers and lines installations, compete with non-conventional load flexibility contracting. The proposed multistage planning methodology aims at minimizing the net present value of all investment and operational costs, while annuity calculations are used to make technologies with different characteristics comparable. A novel combination of the pseudo-dynamic multistage planning approach called forward fill-in with a single-stage planning approach that utilizes load flexibility is developed. The single-stage distribution network planning model is based on the Tabu Search metaheuristic, which has proven to be scalable for realistic large-scale networks. In a case study, the multistage model is applied to a two-stage planning problem. In contrast to single-stage methodologies, the multistage methodology demonstrates the value of load flexibility, accounting for the time value of money when analysing savings due to network investment deferrals. In the case study, flexibility contracting at a cost of 10 €kW per year results in total cost savings of 15.68 . | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | en-GB | es_ES |
dc.rights | es_ES | |
dc.rights.uri | es_ES | |
dc.source | Revista: Electric Power Systems Research, Periodo: 1, Volumen: online, Número: , Página inicial: 110094-1, Página final: 110094-12 | es_ES |
dc.subject.other | Instituto de Investigación Tecnológica (IIT) | es_ES |
dc.title | Multistage distribution expansion planning leveraging load flexibility | es_ES |
dc.type | info:eu-repo/semantics/article | es_ES |
dc.description.version | info:eu-repo/semantics/publishedVersion | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/restrictedAccess | es_ES |
dc.keywords | es-ES | |
dc.keywords | Multistage; Distribution system; Expansion planning; Flexibility; Realistic network | en-GB |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Artículos
Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.