Mostrar el registro sencillo del ítem

dc.contributor.authorTostado Véliz, Marcoses-ES
dc.contributor.authorJordehi, Ahmad Rezaeees-ES
dc.contributor.authorMansouri, Seyedamires-ES
dc.contributor.authorEscámez Álvarez, Antonioes-ES
dc.contributor.authorAlharthi, Yahya Z.es-ES
dc.contributor.authorJurado Melguizo, Franciscoes-ES
dc.date.accessioned2024-05-31T10:20:10Z
dc.date.available2024-05-31T10:20:10Z
dc.date.issued2024-08-01es_ES
dc.identifier.issn0306-2619es_ES
dc.identifier.urihttps:doi.org10.1016j.apenergy.2024.123389es_ES
dc.identifier.urihttp://hdl.handle.net/11531/88739
dc.descriptionArtículos en revistases_ES
dc.description.abstractes-ES
dc.description.abstractHydrogen is called to be one of the most important energy vectors in future energy systems. Nowadays, its use in the industry sector is prominent, finding multiple applications in fertilizer production or oil refining. In this sense, some industry sectors demand a considerable amount of hydrogen for their processes. In many cases, hydrogen must be purchased externally, which supposes a challenge due to hydrogen transportation is costly and few efficient. In this context, local hydrogen production through mature electrolysis technology may suppose an attractive alternative in industrial parks. This paper focuses on this topic, in particular, a risk-averse electrolyser sizing methodology is developed. The new approach accounts for uncertainties in electricity prices as well as local renewable generation and demand through an original hybrid stochastic-robust model. The developed uncertainty modelling is integrated into a novel four-level optimization framework, whose main result is the optimal electrolyser rated power. To efficiently attain the solution, an original hybridization of the Benders' decomposition and the Column and Constraint Generation Algorithm is proposed. The developed methodology results efficient in an illustrative three-industry park, showing that installing local hydrogen generation may reduce the amount of hydrogen purchased externally (by 38) and project costs by 2.5. Furthermore, increasing the robustness level leads to increase the project cost by 8, while assuming unfavourable realization of uncertainties. Moreover, the developed tool is further validated in larger parks, involving an increasing number of industries, showing that the proposed methodology scales well with the size of the park.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceRevista: Applied Energy, Periodo: 1, Volumen: online, Número: , Página inicial: 123389-1, Página final: 123389-15es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleRisk-averse electrolyser sizing in industrial parks: an efficient stochastic-robust approaches_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsElectrolyser; Hydrogen; Industrial park; Risk-averse optimization; Robust optimizationen-GB


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem