Mostrar el registro sencillo del ítem

dc.contributor.advisorMartín Serrano, Javieres-ES
dc.contributor.authorPedreira Lois, Anaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2024-10-13T23:03:01Z
dc.date.available2024-10-13T23:03:01Z
dc.date.issued2025es_ES
dc.identifier.urihttp://hdl.handle.net/11531/95093
dc.descriptionGrado en Ingeniería en Tecnologías Industrialeses_ES
dc.description.abstractEl presente proyecto aborda el diseño de la instalación de climatización de un edificio de oficinas ubicado en la ciudad de Burgos. El objetivo principal es desarrollar y dimensionar adecuadamente las redes hidráulicas, así como seleccionar los equipos más apropiados, con el fin de garantizar una instalación que proporcione confort térmico, sea energéticamente eficiente, minimice el impacto medioambiental y cumpla con la normativa vigente. Buscando proporcionar bienestar térmico y condiciones de salubridad en el edificio, se opta por un sistema de climatización mediante producción por bomba de calor y distribución de agua a cuatro tubos que alimentan a los fancoils como unidades terminales y distribución de aire climatizado mediante conductos desde dichos fancoils. El sistema a cuatro tubos permite calefacción y refrigeración simultáneamente en diferentes zonas del edificio, esto es especialmente importante al tratarse de un edificio de uso oficinas con alta zonificación, ocupación y diferentes orientaciones de la edificación. El sistema permite así, una gran flexibilidad al posibilitar regular de forma independiente cada estancia. Para proporcionar una buena calidad de aire interior, el aire exterior es tratado mediante climatizadores ubicados en la cubierta del edificio, permitiendo una filtración eficaz del mismo, control de humedad, así como un ahorra energético mediante el empleo de free cooling. Se ha logrado el diseño de una instalación de climatización capaz de cubrir las demandas térmicas del edificio, obteniendo una optimización de los consumos energéticos. La instalación garantiza, además, la flexibilidad de poder demandar calor o frío de manera independiente, en las diferentes áreas climatizadas, lo que permite un óptimo confort de los usuarios del edificio, implicando un uso racional de la energía en función de la demanda de cada estancia. El sistema diseñado satisface las exigencias normativas del RITE, del CTE, así como los Objetivos de Desarrollo Sostenible, específicamente los ODS 3, 7, 9, 11 Y 13. Por consiguiente, el diseño ha conseguido aunar eficiencia, confort y sostenibilidad.es-ES
dc.description.abstractThis project addresses the design of the climate control system for an office building located in the city of Burgos. The main objective of the project is to develop a properly sized hydraulic networks, as well as select the most appropriate equipment to ensure the installation provides thermal comfort, is energy efficient, and minimizes environmental impact and complies with current regulations. Seeking to provide thermal comfort and healthy conditions in the building, a four-pipe air conditioning system was chosen, using heat pump production and water distribution to feed the fancoil units as terminal units, and ducted air distribution from these fan coil units. The four-pipe system allows for simultaneous heating and cooling in different areas of the building. This is especially important in an office building with high zoning, occupancy, and different building orientations. The system thus allows great flexibility by allowing each room to be regulated independently. To provide good indoor air quality, the outdoor air is treated by air handling units located on the building's roof, enabling effective filtration, humidity control, and energy savings through the use of free cooling. The design of a HVAC system capable of meeting the building's thermal demands has been achieved, optimizing energy consumption. The system also guarantees the flexibility to independently request heat or cold in the different air-conditioned areas, allowing for optimal comfort for building users and rational energy use based on the demands of each room. The designed system meets the regulatory requirements of the RITE, the CTE, as well as the Sustainable Development Goals, specifically SDGs 3, 7, 9, 11, and 13. Consequently, the design has successfully combined efficiency, comfort, and sustainability.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherKTI-mecanica (GITI-M)es_ES
dc.titleClimatización de un edificio de oficinas en Burgoses_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses_ES
dc.keywordsClimatización, Oficinas, Fancoil, Conductos, Tuberías, Bomba de calor, Calidad de aire.es-ES
dc.keywordsClimate control, Office, Fancoil, Conducts, Pipes, Heat pump, Air quality.en-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States