Mostrar el registro sencillo del ítem
CLIMATIZACION DE UN HOSPITAL EN MADRID
dc.contributor.advisor | Hernández Bote, Juan Antonio | es-ES |
dc.contributor.author | Calderón Sánchez, Gonzalo | es-ES |
dc.contributor.other | Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI) | es_ES |
dc.date.accessioned | 2024-10-28T11:39:34Z | |
dc.date.available | 2024-10-28T11:39:34Z | |
dc.date.issued | 2025 | es_ES |
dc.identifier.uri | http://hdl.handle.net/11531/95300 | |
dc.description | Grado en Ingeniería en Tecnologías Industriales | es_ES |
dc.description.abstract | Resumen del Proyecto El trabajo se ha desarrollado bajo la supervisión de la Escuela de Ingenieros ICAI – Universidad Pontificia Comillas, con colaboración de ARUP S.A. y Grupo Cobra. El objetivo ha sido diseñar una instalación de climatización basada en planos de un hospital ubicado en Madrid. Introducción La climatización forma parte del área MEP (Mechanical, Electrical and Plumbing) y es esencial en la construcción de edificios. El diseño debe considerar múltiples factores como condiciones externas, ocupación, y estética. La amplia oferta de sistemas de climatización exige una planificación cuidadosa. Definición del Proyecto El hospital tiene tres plantas y una forma triangular. Se ha diseñado un sistema de climatización solo para espacios habitables, excluyendo pasillos, aseos y zonas de tránsito. Se realizaron cálculos de carga térmica de verano e invierno basados en datos climáticos de Madrid. Cálculos Técnicos - Cargas térmicas: Se utilizaron hojas Excel de Grupo Cobra para determinar necesidades térmicas en verano e invierno. - Tuberías y grupo de presión: Se dimensionaron las redes de agua teniendo en cuenta pérdidas de carga y velocidades límite. - Conductos: Se diseñaron de sección rectangular, optimizados para espacio en falso techo. - Equipos: Se eligieron Fan Coils, calderas, enfriadoras, difusores y bombas específicas. Resultados Las cargas térmicas calculadas fueron 344,36 W (verano) y 667,28 W (invierno). La Suite 301 fue el espacio con mayor demanda. Las tuberías y conductos fueron dimensionados con materiales específicos como fibra de vidrio tipo CLIMAVER. Conclusiones Se cumplieron los criterios de sostenibilidad y normativa técnica (CTE), utilizando equipos eficientes con certificación ambiental (EPD), garantizando confort y calidad del aire en entornos hospitalarios | es-ES |
dc.description.abstract | Project Summary This project was developed under the supervision of the ICAI School of Engineering – Comillas Pontifical University, with the collaboration of ARUP S.A. and Grupo Cobra. The objective was to design a climate control system based on architectural plans for a hospital located in Madrid. Introduction HVAC (Heating, Ventilation, and Air Conditioning), as part of the MEP (Mechanical, Electrical and Plumbing) field, is essential in building design. Factors such as external conditions, occupancy, and aesthetics must be considered. Due to the vast variety of HVAC systems available, careful planning is required. Project Definition The hospital has three floors and a triangular layout. The HVAC system was designed only for habitable spaces, excluding corridors, restrooms, and other transitional areas. Thermal load calculations for both summer and winter were performed using climatic data specific to Madrid. Technical Calculations - Thermal loads: Calculations were performed using Excel sheets provided by Grupo Cobra for both summer and winter scenarios. - Piping and pump group: Water distribution systems were sized based on pressure loss and flow velocity limits. - Ductwork: Rectangular ducts were designed to fit within ceiling constraints. - Equipment: Selected components include Fan Coils, boilers, chillers, diffusers, and pumps. Results The calculated thermal loads were 344.36 W (summer) and 667.28 W (winter). The most demanding space was Suite 301. Piping and ductwork were sized using specific materials such as high-density fiberglass (CLIMAVER type). Conclusions The project meets sustainability goals and technical standards (CTE), using high-efficiency equipment with Environmental Product Declarations (EPDs), ensuring air quality and comfort in hospital environments. | en-GB |
dc.format.mimetype | application/pdf | es_ES |
dc.language.iso | es-ES | es_ES |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | es_ES |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | es_ES |
dc.subject.other | KTI-mecanica (GITI-M) | es_ES |
dc.title | CLIMATIZACION DE UN HOSPITAL EN MADRID | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es_ES |
dc.keywords | Palabras clave: Fan Coil, Lugar No Climatizado, Environmental Product Declartion, Codigo Técnico de la Edificación, Reglamento de Instalaciones Térmicas, Enfriadora | es-ES |
dc.keywords | Key words: Fan Coil, Not climatised space, Environmental Product Declaration, Codigo Técnico de la Edificación, Reglamento de Instalaciones Térmicas, Chiller | en-GB |