Transmission network expansion planning considering repowering and reconfiguration
Tejada Arango, Diego Alejandro; López-Lezama, Jesús M.; Rider, Marcos J.; Vinasco, Guillermo Enrique (15/07/2015)Transmission expansion planning (TEP) is a classic problem in electric power systems. In current optimization models used to approach the TEP problem, new transmission lines and two-winding transformers are commonly used ... -
Transmission network expansion planning for the Colombian electrical system: connecting the Ituango hydroelectric power plant
Vinasco, Guillermo Enrique; Tejada Arango, Diego Alejandro; Da Silva, Emivan F.; Rider, Marcos J. (01/05/2014)The hydroelectric power plant HidroItuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in ...