• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Documentos de Trabajo
  • View Item
  •   Home
  • 2.- Investigación
  • Documentos de Trabajo
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Ramp-based scheduling vs. energy-block scheduling in day-ahead market

Thumbnail
View/Open
IIT-16-030A.pdf (453.6Kb)
Author
Zhao, Quanyu
Morales España, German Andres
Baldick, Ross
García González, Javier
Ramos Galán, Andrés
Estado
info:eu-repo/semantics/draft
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
Although unit commitment (UC) based on energy blocks is the most common way to schedule the generators in current power systems, it has been reported that it may not be capable of guaranteeing feasible schedules. In particular, when the instantaneous power trajectories are not modeled explicitly, the solution of the energy-block based UC may include violations of ramp constraints of thermal units, which will typically be managed by an inefficient use of the operating reserves procured. In order to cope with these drawbacks, a new ramp-based UC formulation has been proposed recently in the literature, where it simultaneously schedules ramp and energy. However, this approach has only been tested with academic study cases. In order to assess the applicability of such ramp-based UC, this paper presents a comprehensive comparison between the two scheduling approaches applied to a realistic system. The ERCOT system has been selected as a good representative of a large system, where the generation mix is mainly thermal with a remarkable presence of renewable generation. The numerical results obtained provide strong evidence about the benefits of the ramp-based UC with respect to the energy-block approach.
 
URI
http://hdl.handle.net/11531/14229
Ramp-based scheduling vs. energy-block scheduling in day-ahead market
Palabras Clave

Network-Constrained Unit Commitment (UC), Mixed-Integer Programming, Short-Term Planning
Collections
  • Documentos de Trabajo

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback