• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Overcoming the barriers that hamper a large-scale integration of solar photovoltaic power generation in European distribution grids

Thumbnail
View/Open
IIT-17-113A.pdf (1.033Mb)
Date
2017-09-01
Author
Mateo Domingo, Carlos
Frías Marín, Pablo
Cossent Arín, Rafael
Sonvilla, Paolo Michele
Barth, Bianca
Estado
info:eu-repo/semantics/publishedVersion
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
Solar photovoltaic is increasingly seen as a key technology for low-carbon electricity generation. However, the deployment of growing shares of this technology is not without important challenges for their efficient integration in power systems. This paper aims to contribute to overcoming the barriers that hamper a large-scale integration of photovoltaics in the electricity distribution grids. The methodology followed is problem oriented. The paper firstly reviews the technical solutions available to integrate distributed photovoltaics, classifying them in three areas: Distribution System Operator (DSO) solutions, prosumer solutions and interactive solutions. Then, the set of barriers that hinder the implementation of the solutions in a European context are identified, assessing the relevance of each barrier in different countries. Four major barriers are discussed in detail: (1) DSO regulation does not promote smart grid investments, (2) rules limiting PV curtailment, (3) missing frameworks enabling DSOs to access advanced PV inverter capabilities, and (4) regulation hampering storage solutions. Finally, recommendations to overcome these barriers are presented, highlighting that DSO regulation should shift the focus from a short-term to a long-term cost assessment and revenue setting framework, equalizing the treatment of capital and operational expenditures, and implementing specific incentives for DSO innovation. Moreover, a fair debate on the definition of the boundary conditions for the use of renewable curtailment when the other technical solutions cannot be applied or are not economically optimal is required. Regarding the provision of services to DSOs by prosumers and the deployment of distributed storage, the roles, rights and limitations of the different stakeholders need to be clearly defined.
 
URI
https:doi.org10.1016j.solener.2017.06.008
Overcoming the barriers that hamper a large-scale integration of solar photovoltaic power generation in European distribution grids
Tipo de Actividad
Artículos en revistas
ISSN
0038-092X
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Power distribution; Regulation; Solar photovoltaic
Collections
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback