• English
    • español
  • español 
    • English
    • español
  • Login
Ver ítem 
  •   DSpace Principal
  • 1.- Docencia
  • ICAI Escuela Técnica Superior de Ingeniería
  • Grado en Ingeniería Electromecánica
  • KL0-Trabajos Fin de Grado
  • Ver ítem
  •   DSpace Principal
  • 1.- Docencia
  • ICAI Escuela Técnica Superior de Ingeniería
  • Grado en Ingeniería Electromecánica
  • KL0-Trabajos Fin de Grado
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

University of Michigan Steel Bridge

Thumbnail
Ver/
TFGM (11.97Mb)
ANXI (286.6Kb)
Fecha
2018
Autor
Visedo Ceballos, Jorge
Metadatos
Mostrar el registro completo del ítem
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Resumen
Este proyecto abarca el trabajo en grupo realizado por un conjunto de alumnos interdisciplinar en la Universidad de Michigan, junto con un análisis crítico de las técnicas utilizadas. El objetivo del equipo SBT es construir un puente de acero, para la competición internacional “Steel Bridge Team”. Dicho puente debe tener unas dimensiones, y características estructurales básicas preestablecidas. Las principales áreas para estudiar son el diseño y la fabricación del puente, dejando de lado el proceso de construcción, siendo esta área de mayor carácter deportivo-competitivo. En el diseño se ha optado por un puente ligero y con pocas piezas, sin arcos superiores, para simplificar así su posterior construcción. Por otro lado, en la fabricación, todo ha sido construido en Acero, y los principales procesos de fabricación utilizados han sido arranque de material, fresadora en mayor medida y torno en menor. Como método de soldadura, se ha elegido soldadura TIG.
 
This project consists of the team work carried out by a set of interdisciplinary students in the University of Michigan, as well as a critical analysis of the used techniques. The objective of the STB is to build a steel bridge, for the international competition “Steel Bridge Team”. Said bridge must have some preestablished dimensions and basic structural characteristics. The main areas to study are the design and fabrication of the bridge, leaving aside the construction process, which has more of a competitive sport like character. For the design a light and simple bridge was chosen, without an overtruss, to later simplify its construction. On the other hand, on fabrication, everything has been built on steel, and the main fabrication process used have been machining, mainly on mill, but also on lathe. For welding, the TIG welding method was chosen. In the design phase a light bridge with few pieces and without over truss was chosen to simplify its construction. On the other hand, in the manufacture, everything was built in steel, and the main manufacturing processes used consisted of material reduction, with the use of the lathe and the mill. TIG Welding was chosen as welding method due to its good mechanical properties and esthetic finish.
 
URI
http://hdl.handle.net/11531/23917
Trabajo Fin de Grado
University of Michigan Steel Bridge
Titulación / Programa
Diseño y construcción de un puente de acero de 6m de largo compuesto de elementos de 1m. Rápido en montaje, ligero y económico. Incluye modelado 3D, fabricación y ensayo de miembros y conexiones.
Materias/ categorías / ODS
IEM-M (KL0-mecanica)
Palabras Clave
Puente, Diseño, Fabricación, simulación.
Bridge, Design, Fabrication, Simulation.
Colecciones
  • KL0-Trabajos Fin de Grado

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias
 

 

Búsqueda semántica (CKH Explorer)


Listar

Todo DSpaceComunidades & ColeccionesPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipoEsta colecciónPor fecha de publicaciónAutoresTítulosMateriasPor DirectorPor tipo

Mi cuenta

AccederRegistro

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contacto | Sugerencias