• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
  •   Home
  • 2.- Investigación
  • Artículos
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Synthetizing representative periods for chronological hourly electricity generation expansion models

Thumbnail
View/Open
IIT-18-075A.pdf (1.471Mb)
Date
2018-06-27
Author
Doménech Martínez, Salvador
Campos Fernández, Francisco Alberto
Villar Collado, José
Estado
info:eu-repo/semantics/publishedVersion
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
Capacity generation expansion problems have traditionally been represented with low time resolution models due to their high computational cost, very often using blocks of hours with similar demand. However, the current transformation of the power system with the new generation and consumption technologies, the flexibility and reserve requirements, and the expected new behavioral consumption patterns, requires more complex and detailed models with higher time resolution to provide accurate investment decisions and allow for closer analyses. In particular, these challenges require chronological hourly models with constraints linking all the years of the planning horizon, compromising in most cases the computational feasibility. This paper presents a new approach to synthetize a reduced representative time period for capacity expansion problems, for being used in detailed chronological hourly models, while keeping them computationally feasible. The representative period is synthetized by selecting, with a genetic algorithm, those real days that minimizes the distance between the duration curves of a set of relevant variables (such as demand, renewable generation, ramps, etc.) computed for the original and for the representative periods. Results show that investments decisions with the representative period are very similar to those obtained with the full planning horizon, while computational times are strongly reduced.
 
URI
http://hdl.handle.net/11531/33162
Synthetizing representative periods for chronological hourly electricity generation expansion models
Tipo de Actividad
Capítulos en libros
Materias/ categorías / ODS
Instituto de Investigación Tecnológica (IIT)
Palabras Clave

Generation expansion planning, hourly dispatch models, genetic algorithms.
Collections
  • Artículos

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback