Mostrar el registro sencillo del ítem

dc.contributor.advisorCantizano González, Alexises-ES
dc.contributor.advisorGistau Cosculluela, Davides-ES
dc.contributor.authorSáez Jaén, Blancaes-ES
dc.contributor.otherUniversidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería (ICAI)es_ES
dc.date.accessioned2019-02-20T15:20:01Z
dc.date.available2019-02-20T15:20:01Z
dc.date.issued2019es_ES
dc.identifier.urihttp://hdl.handle.net/11531/35388
dc.descriptionMáster Universitario en Ingeniería Industriales_ES
dc.description.abstractESIL, es un colegio e internado fundado en el año 2015 por la Compañía de Jesús, el cual, está situado en el centro-norte de Mozambique, en un área rural aislada del distrito de Tsangano, Tete. Tras analizar la situación in situ, se detectaron las problemáticas existentes en el sistema de abastecimiento de agua y en la gestión de aguas residuales, así como, la necesidad de implementar un sistema de riego para los cultivos durante la época seca. Actualmente, ESIL dispone de un pozo cuya agua es impulsada a través de una bomba sumergible hacia diferentes tanques situados en distintos puntos de la propiedad donde posteriormente, el agua se distribuye a los distintos edificios por gravedad. Sin embargo, el agua no llega a todos los puntos de distribución, no es potable y presenta una turbidez elevada. Debido a esta falta de suministro de agua en los retretes y los lavabos, baños que se construyeron en el colegio están inutilizados y en el internado, mientras que algunos optan por la defecación al aire libre, los que deciden utilizar los retretes se sienten obligados a rellenar cubos de agua por medio de una bomba manual para evacuar las heces. El agua que se bebe se obtiene de una bomba manual de émbolo que nunca ha sido analizada y, además, se tiene otra bomba manual cuya agua presenta un olor desagradable debido a las filtraciones que se están produciendo de una fosa séptica situada a menos de 30 metros de esta, así mismo, unos cultivos de plátanos se han contaminados por este mismo motivo. En cuanto al método de tratamiento de las aguas residuales de ESIL, se dispone de cinco fosas sépticas dispersas que carecen de un filtrado posterior y los efluentes están siendo vertidos directamente al terreno a menos de 2 metros de distancia. Se ha de destacar que se carece de planos de su construcción y que desde 2015, año en el que se construyeron, los lodos no han sido extraídos de las cámaras. Por consiguiente, este proyecto tiene como objeto:  El estudio de las necesidades de agua de los habitantes de ESIL y de las posibles alternativas para decidir la mejor solución técnica y económica del sistema de abastecimiento de agua, así como, el diseño de la red hidráulica de distribución de agua potable a los distintos edificios de ESIL.  Búsqueda de una solución viable para el riego de los cultivos proponiendo qué cultivos se han de regar por goteo y la cantidad de hectáreas a cultivar de forma viable, según las limitaciones técnicas y económicas que se tienen.  Búsqueda de la mejor solución para el tratamiento de las aguas residuales de ESIL, mediante el empleo de tecnologías no convencionales extensivas, así como, el diseño de la línea de tratamiento y cada uno de sus equipos.es-ES
dc.description.abstractESIL is a school and boarding school that was founded in 2015 by the Jesus Company which is located in the north-centre of Mozambique in an isolated rural area of Tsangano district in Tete province. Once there an analysis of the situation was carried out and the existing problems in the water supply system and the wastewater management were detected, as well as the need to implement an irrigation system for the crops during the dry season. Currently, ESIL has a water well which water s driven through a submersible pump to different tanks located at different points of the property where subsequently, the water is distributed to the different buildings by gravity. However, the water does not reach all demand point, is not potable and has a high turbidity. Due to this lack of water supply there are bathrooms that were built in the school that are being unused and at the boarding school while some students prefer to practice open defecation those who decide to use the toilets need to fill buckets with water by pumping the manual pump in order to evacuate the faeces. The water that is drunk is obtained form the manual pump that has never been analysed. In addition, there is another manual pump which water present an unpleasant odour due to filtrations that are taking place in a septic tank located at less than 30 meters of this. Likewise, some banana plantations have been contaminated for the same reason. Regarding the ESIL wastewater treatment method, there are five scattered septic tanks available. There is not a subsequent filtering system and the effluents are being discharged directly to the ground less than 2 meters way from the septic tanks. It is important to highlight that there are no plans of its construction and since the they were built in 2015 the sludge has not been removed from the cameras. Therefore, this master thesis has as its object:  The study of the water needs of the inhabitants of ESIL and the study of the possible alternatives in order t decide the best technical and economic solution of the water supply system. The design of the hydraulic network for the distribution of drinking water to the different ESIL buildings.  Search for a viable solution for the irrigation of crops. A proposal of the types of crops that should be planted and irrigated by drip, as well as, the viable amount surface for cultivation. According to the technical and economic limitations that are available.  Find a solution for the treatment of ESIL wastewater, using extensive non-conventional technologies, as well as the design of the treatment line and each of its equipment.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoes-ESes_ES
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Stateses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/es_ES
dc.subject.otherMII-M (H62-mecanica)es_ES
dc.titleESTUDIO Y REDIMENSIONAMIENTO DE LA INSTALACIÓN DE BOMBEO DE LA ESCUELA SECUNDARIA IGNÁCIO DE LOYOLA EN MOZAMBIQUEes_ES
dc.typeinfo:eu-repo/semantics/masterThesises_ES
dc.rights.accessRightsinfo:eu-repo/semantics/closedAccesses_ES
dc.keywordsGestión de aguas residuales Abastecimiento de aguaes-ES
dc.keywordsWastewater management Water supply systemen-GB


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivs 3.0 United States
Excepto si se señala otra cosa, la licencia del ítem se describe como Attribution-NonCommercial-NoDerivs 3.0 United States