• English
    • español
  • English 
    • English
    • español
  • Login
View Item 
  •   Home
  • 2.- Investigación
  • Documentos de Trabajo
  • View Item
  •   Home
  • 2.- Investigación
  • Documentos de Trabajo
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Power-based generation expansion planning for flexibility requirements

Thumbnail
View/Open
IIT-19-013A.pdf (587.0Kb)
Author
Tejada Arango, Diego Alejandro
Morales España, German Andres
Wogrin, Sonja
Centeno Hernáez, Efraim
Estado
info:eu-repo/semantics/draft
Metadata
Show full item record
Mostrar METS del ítem
Ver registro en CKH

Refworks Export

Abstract
 
 
Flexibility requirements are becoming more relevant in power system planning due to the integration of variable Renewable Energy Sources (vRES). In order to consider these requirements Generation Expansion Planning (GEP) models have recently incorporated Unit Commitment (UC) constraints, using traditional energy-based formulations. However, recent studies have shown that energy-based UC formulations overestimate the actual flexibility of the system. Instead, power-based UC models overcome these problems by correctly modeling ramping constraints and operating reserves. This paper proposes a power-based GEP-UC model that improves the existing models. The proposed model optimizes investment decisions on vRES, Energy Storage Systems (ESS), and thermal technologies. In addition, it includes real-time flexibility requirements, and the flexibility provided by ESS, as well as other UC constraints, e.g., minimum up/down times, startup and shutdown power trajectories, network constraints. The results show that power-based model uses the installed investments more effectively than the energy-based models because it more accurately represents flexibility capabilities and system requirements. For instance, the power-based model obtains less investment (6-12%) and yet it uses more efficiently this investment because operating cost is also lower (2-8%) in a real-time validation. We also propose a semi-relaxed power-based GEP-UC model, which is at least 10 times faster than its full-integer version and without significantly losing accuracy in the results (less than 0.2% error).
 
URI
http://hdl.handle.net/11531/35416
Power-based generation expansion planning for flexibility requirements
Palabras Clave

generation expansion planning, unit commitment, energy storage systems, capacity expansion planning, power system planning, power generation planning.
Collections
  • Documentos de Trabajo

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback
 

 

Búsqueda semántica (CKH Explorer)


Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_typeThis CollectionBy Issue DateAuthorsTitlesSubjectsxmlui.ArtifactBrowser.Navigation.browse_advisorxmlui.ArtifactBrowser.Navigation.browse_type

My Account

LoginRegister

Repositorio de la Universidad Pontificia Comillas copyright © 2015  Desarrollado con DSpace Software
Contact Us | Send Feedback