Mostrar el registro sencillo del ítem

dc.contributor.authorGonzález Romero, Isaac Camiloes-ES
dc.contributor.authorWogrin, Sonjaes-ES
dc.contributor.authorGómez San Román, Tomáses-ES
dc.date.accessioned2019-07-25T07:21:49Z
dc.date.available2019-07-25T07:21:49Z
dc.date.issued09/09/2019es_ES
dc.identifier.urihttp://hdl.handle.net/11531/39044
dc.descriptionCapítulos en libroses_ES
dc.description.abstractes-ES
dc.description.abstractUnder the current European market environment, transmission companies have to decide network expansion by maximizing social welfare. However, generation companies (GENCOs) decide their capacity expansion with the aim of maximizing their own profit. This process, in addition to the increasing penetration of renewable energy, storage and distributed generation, might represent a rupture between short and long-term signals. Therefore, this paper proposes a bi-level formulation for the generation and transmission coordination problem (GEPTEP). We consider a proactive framework in which a centralized TSO represents the upper level while the decentralized GENCOs, that trade in the market, represent the lower level. A case study is presented to evaluate different policy planning objectives. Additionally, the planning results of the bilevel framework (considering both perfect competition and Cournot oligopoly in the lower level) are compared with a traditional cost minimization framework.en-GB
dc.format.mimetypeapplication/pdfes_ES
dc.language.isoen-GBes_ES
dc.publisherUniversidade do Porto; Instituto de Engenharia de Sistemas e Computadores, Tecnologia e Ciência (Oporto, Portugal)es_ES
dc.rightses_ES
dc.rights.uries_ES
dc.sourceLibro: 2nd International Conference on Smart Energy Systems and Technologies - SEST 2019, Página inicial: , Página final:es_ES
dc.subject.otherInstituto de Investigación Tecnológica (IIT)es_ES
dc.titleWhat is the cost of disregarding market feedback in transmission expansion planning?es_ES
dc.typeinfo:eu-repo/semantics/bookPartes_ES
dc.description.versioninfo:eu-repo/semantics/publishedVersiones_ES
dc.rights.accessRightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.keywordses-ES
dc.keywordsGEP, TEP, co-planning, Cournot, proactiveen-GB


Ficheros en el ítem

FicherosTamañoFormatoVer

No hay ficheros asociados a este ítem.

Este ítem aparece en la(s) siguiente(s) colección(ones)

  • Artículos
    Artículos de revista, capítulos de libro y contribuciones en congresos publicadas.

Mostrar el registro sencillo del ítem