Now showing items 1-2 of 2

    • Power-Capacity and Ramp-Capability Reserves for Wind Integration in Power-based Unit Commitment 

      Morales España, German Andres; Baldick, Ross; García González, Javier; Ramos Galán, Andrés
      This paper proposes a power-based network-constrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction ...
    • Ramp-based scheduling vs. energy-block scheduling in day-ahead market 

      Zhao, Quanyu; Morales España, German Andres; Baldick, Ross; García González, Javier; Ramos Galán, Andrés
      Although unit commitment (UC) based on energy blocks is the most common way to schedule the generators in current power systems, it has been reported that it may not be capable of guaranteeing feasible schedules. In ...